Earnings Labs

ESS Tech, Inc. (GWH)

Q3 2024 Earnings Call· Wed, Nov 13, 2024

$1.15

-3.36%

Key Takeaways · AI generated
AI summary not yet generated for this transcript. Generation in progress for older transcripts; check back soon, or browse the full transcript below.

Same-Day

-17.64%

1 Week

-41.46%

1 Month

-42.81%

vs S&P

-44.42%

Transcript

Operator

Operator

Ladies and gentlemen, thank you for standing by. At this time, all participants are in a listen-only mode. Later, we will conduct a Q&A session. [Operator Instructions] I would now like to turn the conference over to Erik Bylin. Please go ahead.

Erik Bylin

Analyst

Welcome to ESS's Third Quarter of Fiscal Year 2024 Financial Results Conference Call. Joining me on the call today from ESS are Eric Dresselhuys, CEO; and Tony Rabb, CFO. Following management's prepared remarks, we will hold a Q&A session. Earlier today, ESS released financial results for the third quarter of fiscal year 2024. The earnings release is available in the Investor Relations section of the company's website. As a reminder, the information presented today will include forward-looking statements, including, without limitation, statements about our growth prospects, partnerships, financial performance, capital raising and strategy for 2024 and beyond. The forward-looking statements are also subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those projected or implied during this call. In particular, those described in our risk factors set forth in more detail in our most recent periodic filings filed with the Securities and Exchange Commission as well as the current uncertainty and unpredictability in our business, challenges with raising capital, issues with our partnerships, the markets, the economy and the current geopolitical situation. You should not rely on our forward-looking statements as predictions of future events. All forward-looking statements that we make on this call today are based on assumptions and beliefs as of the date hereof, and we disclaim any obligation to update any forward-looking statements, except as required by law. During the call, we will also present certain financial information on a non-GAAP basis. Management believes that non-GAAP financial measures taken in conjunction with US GAAP financial measures provide useful information for both management and investors by excluding certain items that are not indicative of our core operating results. Management uses non-GAAP measures internally to understand, manage and evaluate our business and make operating decisions. Reconciliations between US GAAP and non-GAAP results are presented within our earnings release. And with that, I will turn the call over to ESS's CEO, Eric Dresselhuys.

Eric Dresselhuys

Analyst

Thank you for joining the call today. There are many reasons to feel great about the future of ESS, a massive emerging market opportunity, a global top tier customer base, a truly differentiated and IT protected technology, and a great team here in Wilsonville building the product with domestic content. However, the ramp of our revenue continues to be slow due to a variety of external factors. This was evidenced in the last quarter as our ability to stay on schedule was compromised specifically by further delays in the timing of customer funding. Let me provide some more detail. As I mentioned last quarter, project approval and funding was held up at one of our long standing partners impacting our ability to ship and recognize revenue for product that was ready to go. The great news is that the agreement for public and private funding that totaled AUD65 million was announced at the very end of September. This funding was in support of a massive state mandate for long duration storage in Queensland, but unfortunately it did not complete in time for us to close out these transactions before the end of Q3. Since we closed Q3, key contracts for our partner are signed, payments are flowing, and we've started to ship the additional units. So we are optimistic we'll shift to their demand and recognize revenue in the fourth quarter. As we look forward to the end of the year, we are able to provide updated guidance and expect to recognize revenues between $9 million $11 million for the full year, representing meaningful year-on-year growth. We expect the fourth quarter will include previously planned EW systems and the initial commercial shipments of our EC product. As you'll recall from previous calls, the EC product serves as our next step…

Anthony Rabb

Analyst

Thanks, Eric. Unless otherwise noted, all numbers we discuss today will be on a non-GAAP basis. You'll find a reconciliation of GAAP to non-GAAP financial measures in our earnings release which is posted on our Investor Relations website. We reported revenue of $359,000 in the third quarter with the associated cost of revenue at $12.7 million. As previously shared our COGS are subject to an LCNRV adjustment that continues to significantly impact our results especially at lower volumes while we're purchasing materials and producing products for sale in future quarters. This adjustment notwithstanding we continue to make considerable progress towards unit profitability and our continued cost reduction initiatives benefits to the point where our NRV adjustment is down about 40%, which we see as an indicator that we're heading toward more normal COGS reporting. In addition, we've already realized unit cost reductions of 28% on our EC production through the third quarter of this year and expect to achieve nearly 50% in total cost reductions on the EC product for the full year 2024. This great progress is a result of the growing expertise of our teams and optimizing the design for manufacturability along with leveraging EW product cost reduction initiatives. Our non-GAAP operating expenses for Q3 came in below our expectations at $9.2 million. Non-GAAP R&D came in at $2.1 million which again we believe reflects the company's run rate and continued investment in our cost out initiatives and product roadmap improvements on reliability, durability and the efficiency of the EW and EC products. With that we reported Q3 adjusted EBITDA of negative $18.9 million. We were also able to monetize all of our 2023 production tax credits and are currently reviewing bids to monetize our 2024 production tax credits. Based on our ability to monetize these PTCs, we…

Operator

Operator

[Operator Instructions] Our first question today comes from Justin Clare with ROTH Capital Partners. Your line is now open.

Justin Clare

Analyst

Hi. Good afternoon.

Eric Dresselhuys

Analyst

Hey, Justin. How are you?

Anthony Rabb

Analyst

Good afternoon.

Justin Clare

Analyst

I'm looking forward to asking -- hey, doing well. So wanted to start out here just talking about, the customer delays that you had experienced in Q3. It sounds like it was ESI was waiting for financing. Wondering if there were other customers that were also waiting for financing. And then I think you mentioned something about site preparation. So, I'm wondering if customers are working to get permitting or if there are interconnection constraints. Maybe you can just share a little bit more detail on the reasons for the delay.

Eric Dresselhuys

Analyst

Sure. Justin, Eric here, I'll take that. The specific delay that we mentioned in Q3 was limited to one customer, was limited to the projects in Australia. And you may have seen, there was quite a big public announcement made, when, their funding was announced, but, unfortunately, the timing was not sufficient, to get it all, closed out in the quarter. So that was the source of that delay. As we look more broadly, there had been delays, not so much on the interconnect queue at this point, but certainly, we have experienced and our customers have experienced certain site readiness delays. Sometimes that's due to third-party equipment like inverters or transformers, which is you probably know are, quite popular these days and can sometimes be back ordered, in some cases, due to construction on-site. So there's no one thing that causes an issue, but we've tried and continue to work to get better at predicting and managing around those delays.

Justin Clare

Analyst

I see. Okay. That's helpful. And then looking into Q4 here, I think you mentioned you expect to ship six of the EC units in Q4, if I heard right. Wondering, do you expect to recognize the full value of those six units in Q4? And then wondering when those units could be operating in the field and when you might have a sense for the performance of those units?

Eric Dresselhuys

Analyst

Yeah. I'll take that again. On the performance, we think we have a very good sense of the performance. The two units that we currently have here, in Oregon, installed for Portland General are the same model and the same vintage here is what we're shipping to the first commercial customer outside of the state. So I think we feel good about the performance, but the units will ship. The installation will happen and I think that go-live will probably be in Q2 of '25. So, we won't see those operating in the field till the second quarter based on their schedule for going live. So, I don't think we'll see any field results before that.

Justin Clare

Analyst

I see. Okay.

Eric Dresselhuys

Analyst

And we do expect, yeah, we do expect to recognize the revenue on those units this quarter.

Anthony Rabb

Analyst

Yeah as soon as they reach the site, that's when we can recognize the revenue.

Justin Clare

Analyst

Okay. Perfect. Then just one more. Wondering on the ramp-up of your second automated line. I think the expectation was in the first half of next year, that would be, online, but maybe you could just provide an update there. And then I believe that line would enable you to lower your costs. So maybe you could comment on that aspect of it as well.

Anthony Rabb

Analyst

Yeah, this is Tony. So, our expectation is that, that line will still be operational by midyear next year. It's currently being assembled at our vendors. We're going to be doing some testing out at our vendor site, by the end of this year, and then it will be shipped out to our site in the first quarter of next year, reassembled, and then we'll start testing here. And so we feel like we'll have that up and operational by midyear.

Justin Clare

Analyst

Okay. I appreciate it. Thank you.

Anthony Rabb

Analyst

Thanks.

Operator

Operator

Our next question comes from Corinne Blanchard with Deutsche Bank. Your line is now open.

Corinne Blanchard

Analyst · Deutsche Bank. Your line is now open.

Hey, good evening. Maybe to kind of go back on the question around the delays and what how much is being touched further into 4Q, but can you maybe try to give us a little bit of color in terms of the timing, the delays, and maybe potential revenue we can also expect going into 2025. I know you're not going to give full guidance, but just as much detail or color you can share because revenue guidance was decreased quite a lot, talking about $10 million for this year. Can you go up to $40 million or $50 million next year? Can we expect something higher? I'm just trying to get your brain on this.

Eric Dresselhuys

Analyst · Deutsche Bank. Your line is now open.

Yeah. Thanks, Corinne. I'll take it. I think you said it right. We're not giving guidance for the year at this point, but I think you'll see, the ramp up, the fourth quarter will get out. We'll kind of get caught up a little bit on some of the units that we're supposed to have shipped before, and we'll continue to see the ramp up happening in the first half of next year. I think the volume as we see it now is, it is often the case for us back half loaded. So we'll see a ramp that goes in Q2 and Q3 and then picks up pace as we go Q3 and Q4. Again without giving guidance, the numbers that you talk about are quite within the range of what we would see possible.

Corinne Blanchard

Analyst · Deutsche Bank. Your line is now open.

Okay. Very helpful. And then, the second question maybe on the balance sheet. And so you, I mean, the cash balance is low, right? Can you talk I'm sorry if I missed it on the prepared remarks, but can you talk about the financing? You had like a financing, I think, that you are expected to draw on. Can you just yeah, let us know, like, any update on this?

Anthony Rabb

Analyst · Deutsche Bank. Your line is now open.

Yeah. Corinne, how you doing? It's Tony. So we did sign the EXIM loan agreement. So we closed that, and there was a filing, noting that. And but based on our cash balances that we have today, we do not need to draw on that immediately. So we will be able to draw on that when we feel like it's necessary to draw on it is available to us. But we don't need to draw on it today. So we have sufficient capital today to operate without having to draw on it. But the good news is that it is there and available for us.

Corinne Blanchard

Analyst · Deutsche Bank. Your line is now open.

Okay. Just maybe if I just can just to follow-up on that one. At which level of cash or like the short term investment would you feel like you need to draw? Because I think if I add up everything you're 58 million or something like 57 million I think. Is there like a critical level where you will see okay you need to start drawing the money from that line?

Anthony Rabb

Analyst · Deutsche Bank. Your line is now open.

Yeah, I don't anticipate needing to draw on it this quarter. If you look at our cash usage over the last couple of quarters, we feel like we do have sufficient cash without drawing on that to get us well into 2025. And so depending on our cash use needs, at some point in 2025 could be when we may decide we need to utilize that credit facility.

Corinne Blanchard

Analyst · Deutsche Bank. Your line is now open.

Okay. Thank you.

Operator

Operator

The next question comes from Colin Rusch with Oppenheimer. Your line is now open.

Colin Rusch

Analyst · Oppenheimer. Your line is now open.

Thanks. Thanks so much, guys. As you look at the customer activity how many folks are looking at late stage testing data or looking at site selection where they might use the technology? Just trying to get a sense of what the sales pipeline looks like from a late stage and earlier stage perspective.

Eric Dresselhuys

Analyst · Oppenheimer. Your line is now open.

Thanks, Colin. Well, I think it's getting, it's moving along quite briskly. Something we've talked about in the past is the long duration storage has not historically had a lot of regulatory mandate to compel people to act. So people did it because the value proposition and use case demanded it. We're starting to see changes around that. So specific states and we've talked about them, but states like New York and Michigan and others have come out with specific targets around long duration and that has generated a fair amount of activity both in terms of new RFPs, new proposals going out, the proposals that have been out and issued moving through the process. So I think we've seen very good activity. I don't know that I have an exact number to put to it, but it's certainly in the hundreds of millions of dollars of activities now in proposals, in citing, and in some cases going through a regulatory approval process. So we feel very good about that. It's interesting when we look around at markets that have higher renewable penetration that has those tend to be further down the line, in terms of the progression of specific projects and detailed designs. But the one thing that's been a wild card, I'd say, in the last three to six months has been, the data center requests that are coming into utilities. So it's hard to understate, in the prepared remarks, we made comment about of this presentation that I helped lead a panel on at the NYSE. And we hear it when we talk to our utility customers and friends all the time. The amount of load request that's starting to pile into their system is creating a real challenge for people looking to figure out how they're going to meet that demand. And historically load growth has been at a very low rate 0.5%, 1% a year, so it's very modest. That's starting to change dramatically, where people are being, are coming back and translating that into requests for very large projects in the 100s of megawatt range that they're asking for deliveries in the '26 and '27 timeframe. That's a lot faster, a lot more urgent than it's been in the past.

Colin Rusch

Analyst · Oppenheimer. Your line is now open.

Super helpful. And then I appreciate the headwinds around volumes on the cost side, but you've talked about Honeywell in the past supporting the supply chain. Just curious if you can give us an update in terms of those efforts and when we might start to see some of the impact of some of that sale purchasing, some of the design activity you guys have been going through and the cadence of that cost out as you begin to wrap incremental volumes?

Eric Dresselhuys

Analyst · Oppenheimer. Your line is now open.

Sure. The projects are kicking off. It depends on the nature of the product. Some of the supply chain improvements can happen, I think, a little bit faster. I think we'll see benefits starting end of this year, first part of next year. The things that are more engineering and kind of value engineering driven tend to have a little bit longer kind of the incubation and implementation time. So I don't I think we'll see some of those benefits start to kick in the middle part of '25 and accelerate as we get in towards '26. Thank you for the questions.

Operator

Operator

Our next question today comes from Ben Kallo with Baird. Go ahead. I'm sorry I didn't mean to interrupt.

Eric Dresselhuys

Analyst

No. That's okay. Go ahead. I'm done.

Operator

Operator

Ben Kallo, your line is now open.

Ben Kallo

Analyst

Hey, guys. Thanks for taking my question. Just in terms of your customers financing projects, do you think it's like a -- it's going to be a continuous type of thing that you have to facilitate them to finance the projects? And then like how long do you think until you can like you start getting like tax equity involved in a project? I mean is it going to take a year or is this like something that is going to take a long time just to get some new, it's a new technology.

Eric Dresselhuys

Analyst

Yeah. Great question, Ben. I think it there's no one answer to that. The experience that we had in the third quarter was, I think, unique and that it was a non-US customer relatively new party and they were in a negotiation with the government. But on the good news side is the owner of the utilities. So that one, I think, was a very unique deal. Obviously, the creditworthiness of the government entity is quite high, but it was more of a timing and paperwork decision. Most of our customers tend to be large, very well established, entities, and particularly people like the municipalities that we deal with are funding this out of their normal capital budgets. So there is no delay at all. As we get into the some of the projects that are independent, that can change. And I think we see that as a bigger part of our business in the late part of '25 and going into '26, it's all the reasons you mentioned. There's going to be bankability work and studies, tax equity offtake agreements and things and those definitely take longer. So we're trying to build that into our planning and not comment on that for near-term deals.

Ben Kallo

Analyst

Thank you. You mentioned something, Eric, in the prepared remarks about Honeywell and like early discussions around, I'm going to paraphrase it like making a larger battery size than you've even done now. But could you tell me what you mean by that and or tell us what you mean by that?

Eric Dresselhuys

Analyst

Sure. So as I mentioned, in the previous question, one of the dynamics we're seeing in the market now, I think in no small part driven by just total low growths across the energy system is, we would have very typically been having conversations in the single-digit to mid-tens of megawatt size projects before. And one of the questions that come up now are people are looking at much larger projects. 100 megawatt, 200 megawatt plus projects. And so we've been in discussions. One of the things we think Honeywell is really well suited at is building very large scale plants. And so we've been in some discussions about how do we optimize cost and performance at larger scale. So, it's very exciting. One of the things that we've said for years about our technology is, it's definitely benefited by being larger and it's benefited by longer and longer durations. So as the market trends to larger projects and longer durations, that's a great trend for us.

Ben Kallo

Analyst

Okay. I was just clarifying because I thought it's it may seem like there was a difference in configuration, but you're just saying -- you're saying project size is getting bigger and they're helping you with that bigger size type project.

Eric Dresselhuys

Analyst

Yeah. So, yeah, that's really the configuration. The core technology that we're proving now and demonstrating working now in the field of these projects is the same core technology that we can do at 1 megawatt or 10 megawatts or a 100 megawatts. But there are changes to the what people would call the balance of system or balance of plant and how you configure that to be most cost effective and get the highest performance out of it.

Ben Kallo

Analyst

Thank you. My last one just on additional capital. It sounded like you mentioned several different avenues from dilutive to non-dilutive. But is it how could you characterize how far along down the road you guys are and be able to secure capital? Is that something that we should expect in the next two, three months or is there still a lot of unknown around it?

Eric Dresselhuys

Analyst

Well, I don't think we have any timing to announce, but I think that we've been as we've said for the last number of quarters, we've been off evaluating options and looking at what's available. I think we'll pick the pace up on that. We have picked up the pace on that. We'll continue to do it. But at this point, no prediction of when that would close.

Ben Kallo

Analyst

All right. Thanks, guys. You have a good night.

Eric Dresselhuys

Analyst

You too.

Operator

Operator

Our next question comes from George Gianarikas with Canaccord Genuity. Your line is now open.

George Gianarikas

Analyst · Canaccord Genuity. Your line is now open.

Hi, everyone. Thank you for taking my question. My question is with regard to pricing and some of the projects that you're seeing as it relates to the impact of the drop, the dramatic drop in lithium ion pricing. Has that at all guided some of the pricing discussions that you've had with regards to your solution? Thank you.

Eric Dresselhuys

Analyst · Canaccord Genuity. Your line is now open.

Yeah. Thanks, George. The short answer is, yes. We're certainly although the use cases and where people are looking to deploy our technology tend to have some unique characteristics around the duration or the safety. At some level, lithium pricing is always a benchmark in the field, so you have to track to the -- to lithium pricing. We look at it on a levelized cost of storage kind of value perspective. So levelized cost of storage for everybody on the call is kind of a total cost of ownership when we look at capital cost, operating cost, and the number of kilowatt hours or megawatt hours you can transact through the battery over its life. And on a low normalized cost of storage basis, we have a very good story to tell and that's something that people find very appealing about our product. But we certainly are updating those models and watching our pricing constantly to ensure that we're offering a superior value proposition to lithium ion in the segments that we address even at those lower and lower prices. So it's absolutely a real thing that's happening in the marketplace today.

George Gianarikas

Analyst · Canaccord Genuity. Your line is now open.

Thank you.

Operator

Operator

Thank you for your question. There are no other questions in queue. So this concludes today's conference call. Thank you all for your participation and you may now disconnect.