Operator

Operator

Ladies and gentlemen, thank you for standing by, and welcome to the First Quarter 2025 HII Earnings Conference Call. At this time, all participants are in a listen-only mode. After the speakers' presentation, there will be a question-and-answer session. [Operator Instructions] Please be advised that today's conference is being recorded. [Operator Instructions] I would now like to hand the call over to Christie Thomas, Vice President of Investor Relations. Mrs. Thomas, you may begin.

Christie Thomas

Analyst

Thank you, operator, and good morning, everyone. Welcome to the HII first quarter 2025 conference call. Matters discussed on today's call that constitute forward-looking statements, including our estimates regarding the company's outlook, involve risks and uncertainties and reflect the company's judgment based on information available at the time of this call. These risks and uncertainties may cause our actual results to differ materially. Additional information regarding these factors is contained in today's press release and the company's SEC filings. We will also refer to certain non-GAAP financial measures. For additional disclosures about these non-GAAP measures, including reconciliations to comparable GAAP measures, please see the slides that accompany this webcast, which are available on the Investor Relations page of our website at ir.hii.com. On the call today are Chris Kastner, President and Chief Executive Officer; and Tom Stiehle, Executive Vice President and Chief Financial Officer. I will now turn the call over to Chris.

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Thanks, Christie. Good morning, everyone, and thank you for joining the call. I'll start by providing an update on our 2025 operational initiatives, which include enhancing shipbuilding throughput, reducing costs, and securing new contract awards. In the first quarter, we made progress against our goal of improving shipbuilding throughput by 20% year-over-year. Ingalls is largely on plan and their production milestones remain unchanged. Newport News is modestly behind plan. Half of this variance is driven by the atypical weather we experienced in January and February. The most significant variance in Newport News resides with CVN 80. This is directly related to the late major equipment that is to be installed in the whole of the ship. These delays directly impact the construction approach and have limited the progress we can make on the ship. Once this equipment is received from our suppliers, which is scheduled throughout the summer, we anticipate an acceleration of progress. Additionally, for both shipyards, our outsourcing efforts continue, and we expect this to ramp throughout the year to support our throughput goals. Our South Carolina production facility is online and has already completed the first carrier unit for Newport News. The team remains focused on meeting our delivery schedules and is working with the Navy to identify additional initiatives that will accelerate scheduled performance. Turning to our cost reduction efforts. Plans are in place, and we intend to reach our goal of $250 million in annualized cost reduction by year's end. We have an agreement on the Block V FY 2024 II Built contract, and we will now turn our focus to the Block VI and Columbia Build II contracts. Also, I want to highlight how our strategic focus in 2025 aligns nicely with the administration's defense priorities. On April 9th, the Trump administration released two…

Tom Stiehle

Analyst · Barclays. David, your line is now open. Please go ahead

Thanks, Chris, and good morning. Let me start by briefly discussing our first quarter results, and then I will address our reaffirmed outlook for the year. For more detail, please refer to the earnings release issued this morning and posted to our website. Beginning with our consolidated results on Slide 5 of the presentation. Our first quarter revenues of approximately $2.7 billion decreased 2.5% compared to the same period last year. This decreased revenue was attributable to declines at Newport News Shipbuilding, Ingalls Shipbuilding and Mission Technologies. Ingalls revenues of $637 million decreased by 2.7% compared to the first quarter of 2024, driven primarily by lower volume on amphibious assaults ships. Newport News revenues of $1.4 billion decreased by 2.6% compared to the first quarter of 2024, driven primarily by lower volumes in aircraft carriers and naval nuclear support services, partially offset by higher volumes in the Columbia-class submarine program. Mission Technology revenues of $735 million decreased by 2% compared to the first quarter of 2024 driven primarily by lower volume in C5ISR. Results for the quarter exceeded our guidance. The year-over-year decline was expected and related to nonrecurring sales in the first quarter of 2024. Moving on to Slide 6. Segment operating income of $171 million in the first quarter of 2025 increased less than 1% compared to the first quarter of 2024, driven by improved performance at Mission Technologies in cyber, electronic warfare and space and Uncrewed Systems, which was largely offset by lower amphibious assault ship risk retirements at Ingalls. At Newport News, segment operating income improved by $3 million, or 3.7% compared to the first quarter of 2024. Results in the quarter included unfavorable performance-related adjustments for CVN-80 Enterprise as well as Block IV and Block V of the Virginia-class program, which were offset by contract…

Christie Thomas

Analyst

Thanks, Tom. As a reminder to everyone on the call, please limit yourself to one initial question and one follow-up, so we can get as many people through the queue as possible. Operator, I will turn it over to you to manage the Q&A.

Operator

Operator

Thank you very much, Christie. [Operator Instructions] Our first question comes from Doug Harned with Bernstein. Doug, your line is now open. Please go ahead.

Doug Harned

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Good morning. Thank you.

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Good morning, Doug.

Doug Harned

Analyst · Bernstein. Doug, your line is now open. Please go ahead

We've seen now with the CR with additional money for shipbuilding, infrastructure, and then this big authorization proposal that came up on the weekend. Now, when you look at all of this, there should be more money there. But the thing that I've sort of struggled with here is how to take that money and convert it into a plan that can address what you -- say, on the Virginia-class U, Electric Boat and the whole infrastructure needs to happen to really get throughput up. Can you comment on where the responsibilities lie, what the Navy is actually doing so that we can have confidence that not just the money is there, but the real actions are there to change the way things have been going over the last few years.

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Sure, Doug. Let me give that a shot. That's a big question. And it's not only the budget, the FY 2024 boat, the executive orders related to commercial shipbuilding and then reconciliation. There's just a lot of tailwinds right now related to shipbuilding that we need to participate in. Now the first step in seeing what the investments are in that regard is this FY 2024 tub-boat contract. That was a product of really a couple of years of effort by the Navy and the shipbuilders to evaluate the investments that were required to get at accelerating throughput. You see that in the award of that contract. It was very thoughtfully put together. It's a wage support and workforce development support. It's very targeted investments to increase the submarine build rate. So that's all very positive. And then when you look at the CIB and the MIB funding that have been applied to the supplier base, that's also very positive. And you see a buildup of the infrastructure in shipbuilding that will support the growth that we think is ahead of us. So it's really, I would think, an industry-wide, all hands-on deck effort to identify a build-out of that industrial base. Now it's not easy. It takes time. These are heavy manufacturing facilities and equipment. This is building a workforce in a challenging environment. But I think it's only positive for HII and positive for shipbuilding.

Doug Harned

Analyst · Bernstein. Doug, your line is now open. Please go ahead

I guess the challenge here is that there's been a lot of discussion about this over the last few years. And just are there some specific things like if you start to look at what you need to get to that rate of 2 Virginia class per year, what's the trajectory for this? Are there specific things that will enable you and your partner to get there?

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Absolutely. And really the first step of that is this FY 2024 tub-boat contract, targeted investments in workforce equipment, facilities, training that will accelerate the throughput. We have a lot of confidence that when these investments take hold, it's going to start to ramp throughput for the submarine program. And this shouldn't end here. We're going to negotiate Block 6 of the Columbia build 2 contracts. We've identified additional investments that could potentially be applied to further accelerate. So it's going to -- as I said before, it's going to take a while. You just don't build a building overnight. You don't build a workforce overnight. But I absolutely think that these are the right investments to get at the build rate.

Doug Harned

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Okay. Very good. Thank you.

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Thank you

Operator

Operator

Our next question comes from David Strauss with Barclays. David, your line is now open. Please go ahead.

David Strauss

Analyst · Barclays. David, your line is now open. Please go ahead

Hi, good morning.

Chris Kastner

Analyst · Barclays. David, your line is now open. Please go ahead

Good morning. Q – David Strauss: Chris, following up on the CR money, the 242 contract that was announced yesterday, it looks like it's a cost -- some form of cost contract. How is that -- I thought we were operating under fixed price on Virginia-class. So how is that potentially different? What does that contract contemplate differently, I guess, than prior contract?

Chris Kastner

Analyst · Barclays. David, your line is now open. Please go ahead

Yes. It's a bit of a hybrid, but I'll kick it over to Tom. He can answer that.

Tom Stiehle

Analyst · Barclays. David, your line is now open. Please go ahead

Yes. So it's a cost-type contract. It covers both parties, the Navy and ourselves concerns as far as what wants -- to be put on contract. It's a good mix and blend between affordability and profitability. It covers the business environment that we find ourselves operating in. So it's a CTIF and it has some constraints as far as some parameters around the outskirts of where costs can land. But we're happy that we were able to get that done. We've worked hard with the Navy, and it was approved through the government channels. And as you saw, it was awarded last night. So we're excited about that to get going on that contract. Q – David Strauss: Okay. And any more detail on -- obviously, the shipbuilding margins in total came through better than what you had guided to. Newport News got a fair amount better. Ingalls kind of continue to step back. Can you just a little bit more detail on exactly what's going on and why you're forecasting kind of a margin step down again in Q2? And if you also want to talk about what EACs were in the quarter? Thanks.

Tom Stiehle

Analyst · Barclays. David, your line is now open. Please go ahead

Yes, sure. So we guided 5.5 for the quarter. So we're happy with where we landed. We landed about 90 bps above that. Ingalls came in at 7.2 and it was a pacing quarter for them. I guess I can start with the EAC adjustments. We had 80 up and 80 down for a net of zero. So there's no break at that for you. So there was no cumulative adjustments across the company as a net. Ingalls pacing quarter, I would say, right now. We're watching how [indiscernible] are performing. We saw a little pressure on sales -- on the sales front, and it's kind of working ourselves through the heart of those programs down there. From a Newport News perspective, it was a good quarter as they came in at 6.1% on the margin side. It was a mix of some pressures that we've seen on CVN 80 that Chris talked about in his remarks as we're waiting for parts to pop in there. It's just having a little bit of a draw on the EAC schedule on that front. And then the VCS program as we're working people and parts to make sure we have enough people, talented people, the wage element of this recent award will help that. And on the parts side, just making sure we can feed that production line as that production line ramps up and wants to get to the one plus two that we talked about earlier here. So the new award assisted with that with some incentives that helped to offset that. But as I said, overall, it was a net neutral for EAC adjustments across the corporation.

Chris Kastner

Analyst · Barclays. David, your line is now open. Please go ahead

Yes, David, this is Chris. I think you're seeing a bit of frustration regarding the timing of incentives kind of across the portfolio. I've spoken previously that we just have more incentives on our contracts now and the timing is variable at some point. So we try to guide based on what we see in front of us. And if we -- if incentives fall before or after, then it adjusts that a bit, but we're comfortable with our guidance.

Tom Stiehle

Analyst · Barclays. David, your line is now open. Please go ahead

From SMT perspective, we saw that they had a very strong quarter. The CEW business unit performed well against the contracts they had and the uncrewed business unit that we have there is performing well right now. So it's a couple of dollars of margin accretive on that front. The guide for Q2 that you asked about, I think we're just being conservative right now. As Chris said, there's a lot of work to do, although we're on pace on where we want to be on cost reductions and throughput and the contract awards. We've got the first increment of this one here in the spring, and then we have VCS Block VI and Columbia Bill II at the back half of the year. But I think it's just conservatism and prudence on our side that we went back to the lower end of the range.

David Strauss

Analyst · Barclays. David, your line is now open. Please go ahead

All right. Thanks very much.

Chris Kastner

Analyst · Barclays. David, your line is now open. Please go ahead

Thanks.

Operator

Operator

Our next question comes from Scott Mikus with Melius Research. Scott, your line is now open. Please go ahead.

Scott Mikus

Analyst · Melius Research. Scott, your line is now open. Please go ahead

Morning, Chris and Tom. I wanted to follow-up on David's question about the two-boat Virginia contract. It was surprising to see that it was cost plus. But, obviously, there's funding in there for workforce development. Electric boat has an ongoing labor negotiation. I think Newport News is three collective bargaining agreements expiring in 2027. So until those negotiations are wrapped up, should we expect a greater share of shipbuilding orders over the remainder of this year and next year to be more cost-plus incentive fee type structures?

Chris Kastner

Analyst · Melius Research. Scott, your line is now open. Please go ahead

Yeah, I wouldn't necessarily assume that. We need to really get the wage support that's provided in two-boat out to our workforce as quickly as we can. I'm not going to get into dates or commitments about when that happens, because we do have to discuss that with our labor unions. But we believe that when we get the workforce, the support, the wage support to our workforce that retention will improve and productivity will improve, and we'll be able to make our throughput and our schedule commitments. So I wouldn't necessarily think that, that would dictate the contract types. And we're going to evaluate the appropriate contract types based on the situation at hand when we negotiate the contracts. So we're just going to have to move ahead from here on Block VI and Columbia Build II. The hybrid approach that essentially was put in place with the two boat contract forms an interesting basis to roll into those discussions, but we're going to have to establish those contract types as we engage with the customer and our partner.

Scott Mikus

Analyst · Melius Research. Scott, your line is now open. Please go ahead

Okay. And then the Golden Dome is also a big priority for the administration, and that's going to require a lot of equipment, especially radars and potentially the Aegis Ashore system. Lead times on radars are also very long. So has there been communication between shipbuilding and the administration about how to produce enough radars for both the Golden Dome and what the Navy needs for its shipbuilding priorities?

Chris Kastner

Analyst · Melius Research. Scott, your line is now open. Please go ahead

Yeah. So we have not been involved in those discussions to date. I'm unaware of any discussions with the Navy and potential suppliers for that. So I will say our DDG 51 program is -- Aegis program is going well. We saw 129 go on the water, 128 will get to its first trials this year. So we're making progress on our milestones there. But relative to those ships with those new radars, but I'm unaware of any discussions relative to Golden Dome with our product.

Scott Mikus

Analyst · Melius Research. Scott, your line is now open. Please go ahead

All right. Thanks for taking the question.

Chris Kastner

Analyst · Melius Research. Scott, your line is now open. Please go ahead

Sure.

Operator

Operator

Thank you very much. Our next question is from Pete Skibitski with Alembic Global. Pete, your line is now open. Please go ahead.

Pete Skibitski

Analyst · Alembic Global. Pete, your line is now open. Please go ahead

Hey, good morning guys. I guess, Chris or Tom, I'm not sure, but kind of a complicated situation, but you guys have nearly $50 billion in total backlog right now, and you're talking about an incremental $50 billion in new awards in the relative near-term. I probably not think that there's upward pressure on that 4% shipbuilding revenue growth guide in this type of backdrop? Is it still just early -- or is the labor situation that confounding? And I assume the 4% doesn't include the $150 billion in defense adds that's potentially coming down the pike as well. So, I just want to hear your thoughts on that.

Tom Stiehle

Analyst · Alembic Global. Pete, your line is now open. Please go ahead

Yes. So the $50 billion in new awards includes the FY '24 2-boat contract, Block VI and the Columbia second build. It also includes the ASI bundle down in Ingalls. So I wouldn't necessarily correlate it to a $50 billion add in backlog from our current backlog levels. Now, tailwinds related to the 4% absolutely could happen. I'm not going to go there from a guidance standpoint at all right now. But the tailwinds between reconciliation, the executive order, these contracts being put under contract, the investments that are being made in the industrial base and the shipyards, there's absolutely medium-term upside related to that top line growth number. So we just need to take advantage of it, and that's what we're going to work to do over the next couple of years.

Pete Skibitski

Analyst · Alembic Global. Pete, your line is now open. Please go ahead

Okay. I appreciate it. Just one last one for me on Ingalls margin. It used to be kind of reliably in the double digits, and it's kind of regressed over the past 5 quarters or so. What time frame is reasonable for us to think about the current environment changing to one where positive EAC adjustments are more -- maybe more likely than not?

Tom Stiehle

Analyst · Alembic Global. Pete, your line is now open. Please go ahead

Yes. I think you nailed it, Pete. Corporate is positive easy adjustments. It's not so much that we're realizing kind of negative adjustments, but we're staying on our run rate, and we're neutral there. All 3 of those programs are in the production environment, the engineering works, the facility is up and running. We've come through the shipyard of the future and we're facilitized. It's really just about people and parts, being able to hire enough and keep the retention. And as we go forward with that to make sure that we feed the factory to run its production environment there. So I'm comfortable with the leadership down there and that we understand those ships. I think it's just coming post COVID and getting the sand out of the gears there and having the production flow run as fast as possible. We are down probably a couple of years and hours of experience down there. That just works itself through maybe not as cost efficient to realize those upsides or maybe a little bit more rework from time to time, maybe a piece of late material, whether it's CFE or GFE just all conspires to maybe not have a month or 2 early in schedule or an EAC reduction that we just kind of finish on par. But I'm comfortable with where they are right now. I mean, I'd love to see upsides every quarter, but we have not seen like major step backs down there. So I think they understand what's in front of them. It's the throughput we've talked about, more cost efficiency, keep the factory fed with parts. And that shipyard with that portfolio has a legacy of performance. So I think that they'll turn the corner. We haven't given you the time frame yet, and we'll keep you informed quarterly as we watch that proceed forward.

Pete Skibitski

Analyst · Alembic Global. Pete, your line is now open. Please go ahead

Appreciate it guys.

Operator

Operator

Our next question comes from Myles Walton with Wolfe Research. Myles, your line is now open. Please go ahead.

Myles Walton

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Thanks. Maybe, Chris, could you start by talking a little bit about the workforce and how it trended in the first quarter? I think you probably picked up about 500 employees with W International and the press release is still talking about 44,000 employees. So was there much of a movement in net hiring? And how is attrition doing?

Chris Kastner

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Yes. So, interesting. Good question, Myles. We hired 1,000 people in the first quarter, 1,000 craftsmen and women. That's directly related to the change in the strategy in both shipyards to hire more experienced personnel and improve the mix of experienced versus new hires. We think that strategy makes sense. We're going to continue to execute on that. The good news is attrition is down in both shipyards. Not materially down, not back to pre-COVID levels, but it is definitely moving in the right direction. So yes, hired 1,000, which is a bit south of where we wanted to be, but it's consistent with our strategy and attrition is a bit better in both shipyards, which is very positive.

Myles Walton

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Okay. And regarding the 35% increase in outsourcing, can you comment on where you are with respect to that and sort of how the performance quality is looking from what you're outsourcing?

Chris Kastner

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Actually, the way we've executed on our outsourcing program has been very positive. We had some tough lessons learned back at Ingalls and outsourcing in the early 2000s. And we've used those lessons learned and applied them at both shipyards. So, the quality is pretty good. We do pilots in these manufacturing yards before they actually execute work at scale, and we learned through that process, they've done that. We are on schedule in both yards in outsourcing for the year and the quality looks good. So, we're going to continue it. We need to. The industrial base is expanding. We need to take advantage of it, but we need to make sure that it's always high quality because if it's not, you have to redo it and that doesn't help us at all. So yes, it's very positive right now.

Myles Walton

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Okay. And last one on the SAS program, is there a direct benefit to the carrier programs? Or is it more of an indirect benefit with the submarines being the direct beneficiaries?

Chris Kastner

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Yes. It supports the entire nuclear industrial base, so -- and nuclear infrastructure. So, aircraft carriers get support in that as well.

Myles Walton

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

All right. Thank you.

Chris Kastner

Analyst · Wolfe Research. Myles, your line is now open. Please go ahead

Sure.

Operator

Operator

Our next question comes from Seth Seifman with JPMorgan. Seth, your line is now open, please go ahead.

Seth Seifman

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Hi, thanks very much and good morning.

Chris Kastner

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Good morning.

Seth Seifman

Analyst · JPMorgan. Seth, your line is now open, please go ahead

I wanted to when we think about kind of the direct impact of the contract that was announced last night, is there kind of a sizable cash advance associated with it? And is that part of the cash guidance for Q2? And does it enable signing the contract give you opportunity to change some of the assumptions across the different work at Newport News beyond just the two subs that were contracted?

Chris Kastner

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Let me start with that. So guidance assumes execution of the Block V Build II contract that it has all year. And we assume incentives and capital incentives in all of our guidance. So, there are some incentives in Q2 related to that contract as well as other contracts. So it's all in the mix when we come through our guidance for free cash flow for Q2 as well as the end of the year. I don't know, Tom, if you want to add anything in regard to that.

Tom Stiehle

Analyst · JPMorgan. Seth, your line is now open, please go ahead

You really hit it. I mean it was incorporated into the guide that we gave you for Q2. We mentioned at the very beginning of the year expectation to have both that award and then in the back half of the year, VCS Block VI and Columbia Bill II. So we're really happy we got that done here. Cash comes from margin, margin can come from operational performance, capital incentives, performance incentives. And with the new contract add, it helps out incrementally, but it was in the mix, and it was in line with what we expected here. So I'm comfortable with both the guide that we've given you now for Q2 at $200 million to $300 million supports the $300 million to $500 million for the entire year with no change. We have pathways to get there. So I appreciate the question.

Seth Seifman

Analyst · JPMorgan. Seth, your line is now open, please go ahead

And on the assumed -- on the booking rate part of that?

Chris Kastner

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Well, it's all included in our guide and in our accounting. So it's -- we had always assumed that this contract was going to get done this year in all of our -- in our accounting and in our guidance.

Seth Seifman

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Okay. And then just a little bit bigger picture. You had this announcement with -- I think, with Hyundai during the quarter. And one of the topics that some people in Washington are discussing in terms of ways to accelerate shipbuilding is through partnership with other countries. This seems like a pretty early effort based on what was in the press release. But how do you think about where that could go and where international partners might actually be able to fit in?

Chris Kastner

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Thank you for that question. Yes, it is early on in a strategic relationship that's very broad in nature, and it's going to apply to commercial shipbuilding and potentially taking advantage of the economic situation arising out of the executive order on commercial shipbuilding to see if there's an economic model that makes sense for expanding the commercial shipbuilding base in the United States. And then best practices in defense and military shipbuilding. We've been in their shipyard. They've been in our shipyard. They're a great shipbuilder. We're a great shipbuilder, and we can learn from each other. So it's very broad in its nature right now. I think it's -- when you think about having allies participate in shipbuilding, that only makes sense. an expansion of the capacity only makes sense and bringing the best people to the table to execute against this is only the right thing to do. So we don't know where it's exactly going to take us at this point. It's in the initial talks, but we need -- it's part of taking advantage of what we see as a pretty significant tailwind in shipbuilding.

Seth Seifman

Analyst · JPMorgan. Seth, your line is now open, please go ahead

Very interesting. Thanks.

Operator

Operator

Our next question comes from Jason Gursky with Citigroup. Jason, your line is now open. Please go ahead.

Jason Gursky

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Great. Thaks. Good morning, everybody.

Chris Kastner

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Hey, Jason.

Jason Gursky

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Chris, we've talked about this kind of in bits and pieces throughout the call today and I think in prior calls. But I'd like to just ask kind of a step back, bigger picture question about the timing of the transition from pre-COVID to post-COVID chips and maybe give you an opportunity to kind of update us on any changes to the timing and maybe the major risks and opportunities in that time line? I think you announced today some modest delays on the carrier side. So I just want to make sure we're kind of baseline -- rebaselined here on the expectations on timing of that transition.

Chris Kastner

Analyst · Citigroup. Jason, your line is now open. Please go ahead

I think we said that 50% was going to -- we're going to hit the 50% mark or beyond 50% mark in 2027. That's correct. You're correct to pick up on the 80 -- the issues with CVN-80 related to the equipment that's late in the bottom of the ship. We expect to get that over the summer. And then when that gets in, we'll start to make more progress. But that's -- there's no change in the balance of our milestones. We're in a pretty good place there. So I still expect that transition to be on schedule.

Jason Gursky

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Okay. Great. And then Christie is restricting us to one follow-up question. So this might be like a couple of three parts here. I'm just kind of curious on all the reform and the executive orders that are -- have been coming our way to get your thoughts on a couple of different things. First, on shipbuilding assistance of investment that might go into the shipbuilding industrial base. Kind of what strings might be attached to it? And what the -- do you need to invest ahead of getting funds? And does that change the potential cash flow profile ahead for you? And then you mentioned OTAs in your prepared remarks and I think it's kind of tied up in the potential for acquisition reform of FAR and DFARS specifically. So I'm kind of curious, is that something that is going to impact -- those kinds of mechanisms will impact the Mission Systems business more than shipbuilding per se? And what do you think is the long-term impact on the Mission Systems business from a risk and opportunities and margins?

Chris Kastner

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Thanks, Jason. So first things first, the reform, executive orders and cash flow profile. Look, I think it's too early for that right now. There's a lot of work going into making recommendations on how those are rolled out. If you read the executive order, a significant amount of activity that we need to participate in quite actually because we think we can add a lot of provide a lot of input to them so we can kind of get to the right answer. But -- so yes, a lot of work by the team, the government team and the shipbuilding office over the next 30, 60, 90 days to further define what those mean, what the economics mean, what the investments mean. And we'll know more, but I don't see a -- definitely a cash flow drain by us related to that at this point, but more to come. On the OTAs, those are only positive. Things happen faster in an OTA environment. We're pretty good at them. We -- our uncrewed small uncrewed vehicle was an OTA that was converted to a program of record and very positively. So we only see upside related to that. We're comfortable with it. We're going to lean into it. So there is potential upside within Mission Technologies related to that activities. And the rapid capability office sort of activities with our high-energy laser that we're providing for the Army is also positive. So I think you have to lean into this stuff. Historically, our Mission Technologies division has been very good at applying commercial technologies to some of the biggest problems that the DoD has. We're going to continue to do that. We have a team that can do that within Mission Technologies. So as I said before, we're going to lean into it, and I see potential upside related to it.

Jason Gursky

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Awesome. Thank you.

Chris Kastner

Analyst · Citigroup. Jason, your line is now open. Please go ahead

Thanks.

Operator

Operator

Our next question comes from Noah Poponak with Goldman Sachs. Noah, your line is now open. Please go ahead.

Noah Poponak

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Hey, good morning, everyone.

Chris Kastner

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Good morning, Noah.

Noah Poponak

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Yes. Thanks. It was reported in the press, and I think you discussed that there was a draft of the Maritime executive order that included the SAS language. And then we now have the executive order, it doesn't include it. And we have kind of a -- I mean, I know it's a very long-cycle business, but a long planning process to sort out where to go from here. I was curious what your sense is for why that changed in the process? And how likely or unlikely it is that that you eventually see SAS?

Chris Kastner

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Yes. So that's probably not important to how it did not end up in the final executive order. I'm sure that those are -- that's why they're drafts. They go through review with the different elements of the government and ultimately, it wasn't included. Do I think SAS will happen in the future? Look, SAS did a lot of really interesting things. It was very innovative. It accelerated investment into the shipyards to get at the submarine production rate. But right now, our baseline is the Block V contract, the Block VI contract and Columbia Bill 2, and we're working with our customer to March 4 to get those under contract. Now the really good part about SAS is it identified in detail the investments we thought we needed to get this done. You see those investments show up in the Block V contract. And as we move through Block VI and Columbia Bill 2, they should show up there as well. So SAS called another name, but the investments are required. The team knows it. They put those investments together as a team. So we need to make sure that we continue to make those investments to get to the build rate. So it's -- SAS is something that is a name at this point that could or could not happen in the future, but the investments have to happen in order to get to the build rate.

Noah Poponak

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Okay. Chris, how much have you been able to raise wages in recent periods to get the attrition improvement that you referenced? And how much more do you have to raise wages to make much more significant strides on that front?

Chris Kastner

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

So I think the attrition improvement has really been a result of the targeted hiring of more experienced labor. We have addressed wages very tactically, both at Ingalls and Newport News, but we do have labor arrangements, so we haven't been able to do broad labor adjustments. But I think the attrition improvement is more directly related to our hiring strategies to focus on more experienced people.

Noah Poponak

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Okay. And then lastly, Tom, can you just give us the very specifics on why both the Shipbuilding and the MT margin are down a decent amount sequentially in the second quarter?

Tom Stiehle

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Yes. So as we said earlier, just the guide that we're giving is on the conservative side. We saw from MT crew and uncrewed and CEW do well for the quarters as they booked up and they closed out some projects. We don't want to get ahead of ourselves. And then from a Shipbuilding side, I think we're just being conservative. We have some risk to burn down through the year and the initiatives that we've talked about more progress and the cost reductions, I want to see them kind of play out. We do have plans in place for that to occur. But with the risk and variability, we're just staying and guiding closer to the low end of the range there. I'm still comfortable with the guide that we have from 5.5% to 6.5%. It was a good first quarter out of the gate, and we'll adjust kind of going forward as we see successive quarters do well.

Noah Poponak

Analyst · Goldman Sachs. Noah, your line is now open. Please go ahead

Okay. Thank you.

Operator

Operator

Our next question comes from Ron Epstein with Bank of America. Ron, your line is now open. Please go ahead.

Ron Epstein

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Hey. Good morning guys. Maybe going back to…

Chris Kastner

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Good morning.

Ron Epstein

Analyst · Bank of America. Ron, your line is now open. Please go ahead

…a couple of questions we've heard before, maybe Doug's earlier. And what has to happen in the shipyards to really update the manufacturing process, right? I mean when you look at how the Koreans, do it and their commercial operations, it seems like there's more automation, they build ships differently. I mean realistically, how much of that can be deployed in our military shipyards to improve throughput in the whole nine yards?

Chris Kastner

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Yeah. I like the distinction you're making between the Commercial manufacturing process and the Defense process. They are different. When you're getting at a rate on fairly simple ships to build that aren't as dense, it's just a different process. So what's it going to take? Fortunately, we've been doing this work for a while now, identifying, what's it going to take to increase the submarine throughput, and it's going to show up on that FY 2024 two-boat contract. These are targeted investments to create capacity and increase the efficiency on how the ships and how the manufacturing works through the process. We've been working very hard at it. We know where the constraints are. And once they get implemented, I'm very confident that things are going to improve.

Ron Epstein

Analyst · Bank of America. Ron, your line is now open. Please go ahead

I mean is it more automation? I mean are there things like that that you can do, to take out variability or...

Chris Kastner

Analyst · Bank of America. Ron, your line is now open. Please go ahead

It's more about streamlining. There is some automation that can take place to begin at the front end of the process. We have AI pilots going on in both shipyards where we can be more efficient in analysis of scheduling per se or quality. But this is more about efficiency of the manufacturing process and eliminating roadblocks or ensuring that your critical path is squared away. It's not real automation when you get to the back half of the process. This is all about throughput and efficiency and throughput.

Ron Epstein

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Got it. Got it. And then maybe just one more, what are you seeing in terms of demand for your unmanned product for the autonomous stuff?

Chris Kastner

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Yeah. So really good in the uncrewed space, not only in our -- as I said in my remarks, we have really a couple of hundred in backlog. We could have significant ramp this year executing on that small uncrewed underwater vehicle space. So demand is only improving in the uncrewed space, underwater uncrewed space, not only for that product, but derivatives of that product, both domestically and internationally, so some very positive developments in the uncrewed space.

Ron Epstein

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Got it. All right. Thank you.

Chris Kastner

Analyst · Bank of America. Ron, your line is now open. Please go ahead

Sure.

Operator

Operator

Thank you very much. I'm not showing any further questions at this time. I would now like to hand the call back over to Mr. Kastner, for any closing remarks.

Chris Kastner

Analyst · Bernstein. Doug, your line is now open. Please go ahead

Thanks again for your interest and participation today. I look forward to providing updates as we progress throughout the year.

Operator

Operator

Thank you very much, everyone, for joining. That concludes today's call. You may now disconnect your lines.