Skip to main content
Earnings Labs

HPURF (HPURF) Q3 2026 Earnings Report, Transcript and Summary

HPURF (HPURF)

Q3 2026 Earnings Call· Tue, Oct 20, 2026

—

—

HPURF Q3 2026 Earnings Call Key Takeaways

AI summary not available yet

Be the first to generate an AI summary of this earnings call. Takes about 20 seconds, and the result is saved and available to everyone afterwards.

HPURF Q3 2026 Earnings Call Transcript

Mathias Meidell

Management

Hi, and welcome to Hexagon Purus Q3 2026 Presentation. My name is Mathias Meidell, and I will be moderating from the studio in Oslo. As usual, I'm also joined by Group CEO, Morten Holum; and Group CFO, Salman Alam. The agenda for today includes the highlights from the quarter, a company update, the financials and the outlook. We will end the presentation with a Q&A session. So please feel free to enter your question via the function on your screen. And with that, I'll pass the word over to you, Morten, who will take us through the highlights of the quarter.

Morten Holum

CEO

Thank you, Mathias, and good morning, everyone. Thanks for tuning in to our webcast this morning. Key developments in the second (sic) [ third ] quarter. Number one, revenue remained broadly stable compared to last quarter. Number two, cost base has been substantially reduced. The annualized cost base in Q3 is around 50% lower than in 2024, which shows that the targeted cost cuts have been delivered. And finally, number three, the order-book visibility for 2027 has improved and is now more or less in line with where we were at this point last year. So let's look at it in a bit more detail. Starting with revenue on the left. Revenue in the third quarter was NOK 150 million. We had a positive working capital true-up of NOK 7 million related to the U.S. divestment. So excluding that, underlying revenue in Q3 was NOK 143 million, which is down 20% year-over-year on a comparable basis. We had expected higher revenue in Q3, but had some deliveries pushed into Q4, partly related to customer scheduling and partly related to supply chain. EBITDA on the right was minus NOK 83 million in Q3 compared to minus NOK 116 million in Q3 last year. So this is somewhat better than last year despite 20% lower revenue, which is mainly driven by the substantial reduction in fixed costs. Looking at revenue composition, the revenue mix shifted a bit in the third quarter. Largest revenue share in Q3 was Hydrogen Infrastructure with almost 30% of the total. This is still our largest product area, but we had significantly higher share of revenue coming from Battery Mobility in Q3 this year, 24% of total revenue, up from 7% in Q3 last year. The year-over-year revenue bridge is putting things on a like-for-like basis by excluding the effects of the divested U.S. business. And with that exclusion, revenue in Q3 was 20% lower than last year. Hydrogen Infrastructure, down 45%, which is a pure volume effect. And Hydrogen Mobility was also down by 44%, where lower volume in transit bus was only partly offset by higher volume in rail applications. We delivered storage systems to Stadler's hydrogen train in California now in Q3. On the positive side, we had strong revenue growth in Battery Mobility following deliveries of 8 vehicles to Hino in Q3, and we expect activity to remain high also in Q4. We have truck deliveries to Hino and deliveries of Hydrogen storage systems and Battery Systems to Toyota North America. In other applications, there were limited changes, a bit lower activity from industrial gas and a bit higher revenue from Maritime. The order book remains broadly stable from last quarter, but the visibility for 2027 has improved. Hydrogen infrastructure accounts for a larger share of the order book, 55%, while Hydrogen Mobility accounts for 17%. We have good visibility for Battery Mobility for the remainder of 2026, but limited visibility going into 2027. But with an increased number of trucks now in customer demo programs and good feedback from customers, we're working on converting that interest into firm orders. As of Q3 '26, around 58% of the order book is for execution this year, which means we're going to have a busy quarter now in Q4. And we're also encouraged by the strong order intake for hydrogen distribution in the quarter. As you can see on the right-hand side, 40% of the order book is for delivery in '27 compared to 15% in Q2. So the order book for next year increased by almost 3x in the quarter. The current order book will be executed on a lower cost base than the comparable quarters in 2025. So the levels we're at now is not too far away from supporting positive EBITDA operations. And with good execution, the anticipated revenue in Q4 provides an opportunity to approach underlying EBITDA breakeven at Group level for the first time. We have made substantial changes to the size and the cost of our operations since the beginning of '25. And most of the intended structural measures are now complete. The annualized cost base in Q3 has been cut by approximately 50% compared to 2024. This has been done partly by reducing the Group's workforce by around 50%, partly by cutting other OpEx spend and partly by undertaking structural measures such as the U.S. business divestment and reducing our exposure to the China JV. These initiatives will enable us to reach EBITDA and cash breakeven at significantly lower revenue. We have recalibrated the company operations to match the current market conditions. Earlier this month, we launched HyCarrier, our next-generation distribution system for multimodal hydrogen transportation. HyCarrier builds on a strong legacy of more than 650 hydrogen distribution modules already in the field and several decades of experience with safe and secure transportation of compressed gases. The HyCarrier marks an important step in future-proofing Hexagon Purus' hydrogen distribution offering, and we look forward to start delivering this new module to our customers. And the first units are planned to be shipped in April next year. HyCarrier features a modular setup with optimized cylinder dimensions and system design that allows for higher payload with approximately 40% less cylinders on board compared to the existing distribution system. It's a higher-payload system with capacity up to 1.3 tonnes of hydrogen at 380 bar working pressure, and that reduces the total cost of ownership for our customers. Compared to the existing system, the HyCarrier allows for lower material input without compromising on system capabilities and safety level. The new cylinder design also increases the periodic inspection interval from 5 to 10 years, which reduces operational downtime and inspection costs over the system lifetime. And the next-gen module also features a modular design with standardized components to simplify repairs and spare parts supply. And finally, it's, of course, designed with integrated safety features, building on our in-field experience from more than 650 units that we have manufactured and put into the field. So this confirms our leadership position in this space and further strengthens our competitiveness. So those were the main points for Q3. Overall, I think we had expected a higher revenue quarter. But with some deliveries pushed beyond the quarter end, we expect to make that up now in Q4, which will be a very busy quarter. And with that, I'll hand it over to our CFO to go through the financials. Salman?

Salman Alam

CFO

Thank you, Morten, and good morning, everyone. Taking a step back, the third quarter was broadly stable in terms of activity compared with the second quarter and somewhat below what we had planned for, for the reasons Morten just described. Revenue amounted to NOK 150 million with somewhat of a different mix than in recent quarters. There was a lower activity in Hydrogen Infrastructure and transit bus, but that was, to some extent, offset by higher activity in Battery Mobility. We ended the quarter with NOK 220 million in cash and an order backlog of NOK 508 million. As Morten touched on as well, the total backlog is broadly unchanged from the second quarter, but its composition has shifted. So the portion of delivery in 2027 increased significantly during the quarter. From a financial perspective, the main feature of the quarter is the lower cost base, which is now more clearly visible in the P&L, which we'll look at in a moment. Moving on to the P&L. Revenue was down 40% compared from the same quarter last year, but that comparison quarter still includes the divested U.S. business in the China joint venture, which was deconsolidated in the first quarter of this year. Together, they contributed NOK 74 million of revenue in the third quarter last year. Therefore, excluding that effect and the NOK 7 million working capital true-up from the U.S. sale recognized this quarter, the like-for-like decline was 20%. The underlying picture is somewhat different than in recent quarters. Hydrogen Infrastructure and transit bus were lower, while Battery Mobility and rail applications were higher as we delivered -- made customer deliveries in the quarter. Year-to-date, reported revenue is NOK 701 million, up 4%. And that figure includes about NOK 141 million of extraordinary gain from the 2 transactions that we announced in the first quarter. On a like-for-like basis, excluding those gains and divested revenue, year-to-date revenue is NOK 506 million versus NOK 515 million last year. So broadly stable revenue development year-over-year, year-to-date, but delivered on a considerably smaller structural footprint. On costs, cost of materials was NOK 84 million or 56% of revenue, which is unchanged from the second quarter of this year and up from 47% last year. The ratio -- cost of materials ratio this quarter was impacted by high materials cost on the Hino truck deliveries in the BVI segment, which was mainly built from higher-cost legacy inventory, and by a NOK 5 million inventory write-down that we did in the HMI segment. Payroll was NOK 90 million against NOK 187 million last year and NOK 109 million underlying in the second quarter. This is the first quarter that mostly reflects the payroll effect of the headcount reductions that we've implemented to date. Other operating expenses were NOK 59 million against NOK 62 million last year and includes approximately NOK 6 million in strategic and consultancy costs related to the ongoing restructuring. Total operating expenses, therefore, ended at NOK 233 million against NOK 368 million last year, which is a reduction of just over 1/3. EBITDA was minus NOK 83 million against minus NOK 116 million last year, which is an improvement of NOK 33 million despite around NOK 100 million of less revenue and an improvement from the minus NOK 102 million in the second quarter. The improvement in the third quarter itself was held back by some volumes that slipped into the fourth quarter, the mix effects that I just described and also restructuring-related costs. Year-to-date, EBITDA improved from minus NOK 519 million last year to minus NOK 184 million this year. And when we strip out the extraordinary gain, the underlying improvement is roughly NOK 200 million or close to 40%. That's mainly the cost program then flowing through the numbers. Moving below EBITDA, depreciation was NOK 40 million in the quarter, down from NOK 68 million, reflecting the lower asset base following the divestments that we completed earlier this year. The share of loss from associates was NOK 6 million, which represents our minority interest in the China JV. Finance income was NOK 32 million, of which around NOK 30 million is currency effects and NOK 2 million is interest on deposits. Finance costs were NOK 144 million, where a large majority is non-cash. About NOK 74 million is payment-in-kind interest on the 2 convertible bonds and around NOK 8 million is interest on lease liabilities and other debt. The remaining NOK 62 million is currency effects. Tax was immaterial as the Group is not in a taxable position and net loss for the quarter was NOK 242 million against NOK 365 million in the same period last year. Moving on to the segments. As a reminder, HMI is our European hydrogen cylinder and systems business produced out of Kassel and Weeze in Germany, together with our industrial gas activity. With the reductions implemented in Kassel and Weeze earlier in the year, now mostly reflected in the numbers, the segment's cost base is more aligned with the demand picture we're currently seeing, and we saw periods of profitable operation at the Kassel facility during the quarter. HMI revenue was NOK 104 million in the quarter, down 55% as reported. Adjusting for divested U.S. business, which contributed NOK 65 million in the comparison quarter, revenue declined 38% year-over-year. Hydrogen Infrastructure delivered NOK 41 million of revenue against NOK 75 million last year on lower hydrogen distribution volumes this quarter. A substantial volume of distribution modules is now scheduled for delivery in the latter part of the fourth quarter, especially in November and December. Hydrogen Mobility was NOK 32 million against NOK 94 million last year, with the prior year figure including the U.S. business. Transit bus accounted for NOK 19 million against NOK 92 million last year, where NOK 57 million when excluding the -- or NOK 57 million when excluding the divested business. This is consistent with the muted expectations for bus that we've communicated throughout the year, and it's in line with -- broadly in line with expectations. Rail applications contributed NOK 11 million and industrial gas came in at NOK 27 million, which is down 19% year-over-year. EBITDA was minus NOK 34 million against minus NOK 47 million last year. Year-to-date, the underlying improvement in EBITDA is cost driven. The run rate effect of the workforce reductions in Kassel and Weeze is now largely in the numbers and the lower cost base and improved productivity supported periods of profitable operation at the Kassel facility during the quarter. Year-to-date, the underlying improvement in EBITDA is cost driven and the run rate effect of the workforce reductions in Kassel and Weeze is now largely in the numbers. Moving on to the next page on BVI. This is then our battery systems business in Kelowna and the U.S. in Dallas. The main customer here for this segment is Hino. And in the quarter, we mainly saw delivery of battery electric trucks to Hino. The operational focus for this segment remains the same as last quarter, executing on the truck program and the hydrogen and battery systems deliveries to Toyota within the smaller organization established through the restructuring earlier this year. Looking at the financials, BVI revenue was NOK 35 million, which is up significantly compared to last year. The quarter comprised delivery of 8 battery electric trucks to Hino compared with 1 truck in the same quarter last year, together with sublease income from the Dallas facility. Some hydrogen and battery system deliveries to Toyota and truck deliveries to Hino shifted from the third to the fourth quarter, which weighed on revenue in the quarter and adds to the volume scheduled for delivery towards year-end. EBITDA was minus NOK 28 million against minus NOK 30 million last year and minus NOK 75 million year-to-date against minus NOK 115 million last year. The higher revenue did not translate into improved profitability in the quarter as the trucks delivered carried high materials costs from legacy inventory, and we needed additional temporary labor to support truck builds in the quarter. Executing the substantial fourth quarter delivery schedule while controlling production costs and cash requirements is the most important operational item for the BVI segment in the remainder of the year. Moving on to the balance sheet. Total assets ended the quarter at NOK 2.6 billion, down from NOK 2.8 billion at the end of the second quarter, which primarily reflects the net loss for the period and a working capital release. Property, Plant and Equipment was NOK 589 million, broadly stable on normal depreciation and minimal additions. Inventory was NOK 360 million, which is down NOK 22 million as we continue to convert inventory into deliveries. Trade receivables were NOK 198 million, up NOK 18 million, mainly reflecting the higher revenue in BVI in the quarter, and cash ended at NOK 220 million. On the other side of the balance sheet, non-current interest-bearing debt stood at NOK 2 billion, primarily the debt component of the 2 convertible bonds, which continues to grow mechanically with the payment in-kind interest accrual. Current liabilities increased to NOK 409 million from NOK 383 million, driven by higher trade payables and by contract liabilities, which is mainly customer pre-payments. Total equity was minus NOK 224 million at quarter end against NOK 41 million at the end of the second quarter and NOK 1.1 billion a year ago. The development reflects the loss for the period, including the accrued interest on the convertible bonds and the Group now is in a negative consolidated equity position. We are in discussions with the company's stakeholders on a financial restructuring, including measures relating to the 2 outstanding convertible bonds with the objective of reducing the debt burden and restoring positive equity. On liquidity, the measures taken over the past 2 years have substantially reduced our funding requirements. And on current forecasts, the Group has sufficient liquidity to meet its obligations for at least the next 12 months. Those forecasts are obviously sensitive to volume, delivery timing, margins, customer payments and order intake, but that's the current assessment. Net cash flow was minus NOK 88 million in the quarter, taking cash to NOK 220 million. Operating cash flow was NOK 67 million and consists of the operating loss in the quarter, partly offset by a NOK 64 million working capital release. Cash flow from investing was positive NOK 9 million, where CapEx and capitalized development together was around NOK 4 million, which continues to be deliberately restrained, and we received NOK 10 million from escrow release and working capital true-up related to the U.S. divestiture from earlier this year. Financing and FX absorbed NOK 30 million, which is lease payments of NOK 18 million together with a negative currency effect on cash of NOK 11 million. With that, I'll hand the word back to Morten for the outlook.

Morten Holum

CEO

Thank you, Salman. Let's move on to the outlook then and what we expect for the time ahead. There are 4 key messages I'd like to give related to the outlook. The first one, the overall market situation has not changed significantly during the quarter. We have seen some positive signals recently, but the hydrogen market remains demanding. Order visibility continues to be a challenge for the industry, but recent data points on growth in clean hydrogen production and investments into a heavy-duty transportation ecosystem in parts of Europe are encouraging. At the same time, high costs, infrastructure constraints and policy uncertainty continue to weigh on the speed of market development. Number two, we have materially reduced our cost base. And alongside these cuts, management and the Board are working intensively on restructuring the company's balance sheet. We ended the third quarter with negative consolidated equity, and the current balance sheet position is not sustainable. We are in dialogue with key stakeholders on solutions to address the company's debt burden and establish a sustainable capital structure. Number three, we entered the fourth quarter with most of the expected revenue covered by firm orders and a substantially lower cost base. The anticipated volumes provide an opportunity to approach underlying EBITDA breakeven at Group level for the first time, although this, of course, remains dependent on completing a demanding delivery schedule at expected margins. Hydrogen distribution deliveries are concentrated in Q4, leaving limited room to absorb delays before year-end. And the last number four, while we have done most of the hard work on costs, we now need to turn that into consistent breakeven performance and a balance sheet that supports the business. And we will continuously assess the market conditions and adjust our operations, our cost base and our strategic priorities as required. So our overall priorities remain unchanged. One is revenue, executing the business that we have in our order book for Q4 and build a stronger order book for 2027. Then on costs and liquidity, we've come a long way on costs, and that will remain a core focus topic also going forward. And we continue to manage cash carefully to ensure that we maintain sufficient liquidity. On our current plan, we expect to have sufficient liquidity coverage for at least the next 12 months ahead. And finally, the balance sheet. We're now, as I said, working actively with stakeholders to address the convertible debt and restructuring the balance sheet to establish a stronger financial position for the years ahead. We're actively and diligently working our way through what is a quite demanding period. We remain focused on what we can control ourselves, managing costs and our internal operation. And then we're driving the financial restructuring process forward together with stakeholders with the aim to improve the capital structure and the balance sheet. That concludes our presentation for today, and we'll now open it up for Q&A. Mathias?

Mathias Meidell

Management

Yes. Thank you, Morten and Salman. So let's start with the first question to you, Morten. HyCarrier's first customer delivery is planned for April 2027. Do you already have firm customer orders or binding commitments for the new system? And what revenue contribution could it realistically make in 2027?

Morten Holum

CEO

We already have orders. So part of the order book for 2027 is also containing the HyCarrier solution, and we have a launch customer for that and other customers as well. And then gradually, over time, we expect more and more volume to translate over to the new solution, particularly for those customers that require the payload and have a lot of capacity that they need to move. So yes, gradually, we expect more and more volume to move over in that direction.

Mathias Meidell

Management

And then another question for you as well, Morten. Can you confirm the current status of the Type 4 cylinder certification for the Chinese domestic market? What specific steps remain? And do you still expect approval by year-end 2026?

Morten Holum

CEO

I think we are about 80%, 90% of the process gone through. And it's -- it might bleed into Q1, but we are very near the point now where we expect to have certification completed.

Mathias Meidell

Management

Okay. Then this is for you as well, Morten. The 2027 order book has increased to approximately NOK 200 million. Will the total order book -- while the total order book has declined to NOK 508 million, how much additional firm order intake do you expect to secure for 2027? And when should we see recovery in revenue?

Morten Holum

CEO

Yes. So the position we're at now is roughly where we were last year. So it's unusual for us to stand at the end of the third quarter in 1 year and have coverage for all the next year because the time line from an order to when we actually have to execute and deliver is quite short. So I think we're -- as I said, we're roughly where we were last year. And of course, we're going to work intensively in the coming periods to gradually shore up and firm up more of the order book for 2027.

Mathias Meidell

Management

And then on that note, we can take a follow-up question on this topic for you, Salman. In the report, you state that the backlog for delivery next year is broadly comparable in terms of the following year backlog at the end of Q3 2025. However, looking at your reported order book at the end of Q3 2025 of NOK 974 million, 2026 accounted for 40% or NOK 390 million. In the current Q3 2026 order book of NOK 508 million, 2027 accounts for 40% or NOK 203 million. This suggests that the backlog for execution in the following year was nearly twice as large as the same point last year, a long one. Am I missing something here?

Salman Alam

CFO

Yes. I think what the order book that's being referred to for last year includes the divested revenue related to the U.S. business, which we announced earlier this year. So on a like-for-like basis, if you exclude that order backlog, the backlog for execution next year is broadly similar to that of last year.

Mathias Meidell

Management

Good. And then another question for you, Salman. What do you mean by an opportunity to approach underlying EBITDA breakeven at Group level? What does approach mean in this sentence? What does underlying breakeven mean? What do you mean by Group level? In other words, does it mean that you will report negative consolidated EBITDA as well in Q4 or less negative than Q3?

Salman Alam

CFO

I think it means that there is a real chance to approach underlying EBITDA breakeven as we've stated in the report. What that means is that from -- if you look at the underlying operations, there is a real possibility that we can get close to EBITDA breakeven. Whether we get fully there or not, that's, implicitly in the way we state there is a risk to that assumption. And so it can go both ways.

Mathias Meidell

Management

Okay. Another one, this is for you, Salman as well. You have a cost of NOK 6 million in strategic and consultancy costs related to the restructuring. Does this mean that you've engaged a financial adviser for the financial restructuring? If so, what time line are you working on here?

Salman Alam

CFO

Yes. I think, as mentioned, this is -- the balance sheet restructuring is a key priority at this point in time. And then we're, of course, supported by the appropriate advisers on that topic.

Mathias Meidell

Management

Okay. Some questions coming in here. Okay. So -- for you, Salman. With the cash down to NOK 220 million and operating cash flow of minus NOK 67 million in Q3, how much -- how many months of liquidity do you currently have? And is additional capital needed before the convertible bonds mature?

Salman Alam

CFO

Yes. As we stated in the report, we -- on current estimates, we see that we have liquidity to meet our obligations for at least the next 12 months. So I think that gives an indication for the cash runway, and that's the current estimate based on what we know today.

Mathias Meidell

Management

And then another one for you, Salman. Are you comfortable with the carrying value of your balance sheet on the PPA side, on the asset side? When did you last do an impairment test?

Salman Alam

CFO

Yes. So this is a continuous consideration we have, and we're assessing the balance sheet values on a quarterly basis.

Mathias Meidell

Management

Thank you. I'm just checking if there's any final questions coming in here. I think that concludes it. So thank you, Morten and Salman. And this wraps up then the question we had received from the audience today. So on behalf of Hexagon Purus, I would like to thank you all for spending time with us this morning, and we look forward to seeing you again soon. Thank you very much from Oslo.