Yes. Hi, John, this is Chris again. I think from the genesis of this project, it really starts with the team, and the teamwork that was illustrated with bringing this project to fruition. Travis Wolf, the Team Lead of our West Texas asset. Former Max Ops graduate, he’s now running the asset there, the teamwork between the teams, the land group, the permitting side to get this well on the schedule and permitted properly. But then from the technical side, it was – the curve on these U-turns, I think if you’re looking at a piece of paper looks somewhat dramatic, but actually the curve from a technical perspective of in the curve, it’s actually less of a build when we made that turn to come back towards the heel of the well, less of a turn than actually the curve when we go from a vertical portion into the horizontal. And so I think from a technical standpoint, we were very confident in our team, confident in the drilling group, led by obviously Billy, Josh Basur [ph]. Our MaxCom team plays an integral part in projects like this of keeping us in zone, and allowing us to drill, as fast as we have proven that we can. Obviously we recognize and realize there is a time savings component to this of, if you drill four single mile wells versus two U-turns, we’ve calculated it’s about a 50% reduction. So not only is there a cost savings associated with that, but you’re bringing offset wells that you’ve shut in, you’re bringing these wells to production faster. And so there’s a time savings component to that, but then also a cost savings. We’ve documented it’s about $10 million in estimated savings that we’re going to realize, when you think about the amount of steel that’s needed to case a four string well, if you’re doing four single mile laterals versus two U-turn horseshoes, we’re actually saving about 10 miles of casing basically by reducing two vertical portions of these wells. And so a lot of work was done on the team side, not just from the reservoir group, the land group permitting production. It really has been a team effort that is, it’s truly indicative of a lot of these operational projects that we take on, whether it’s Simul-Frac, Remote Frac, dual-fuel usage, U-turn wells, if you come to anything, like any meetings that we have, it is truly a team effort from land to legal to reservoir. And so we’re extremely proud of these two projects or these two wells. There is still work to do, and we’re expecting to turn these online on the latter half of this year.