Roger Jenkins
Analyst · Roth MKM. Please go ahead
Thanks for that question, Leo. No, absolutely. When we say well discovery, we anticipate on producing that well and we anticipate increasing our working interest on that well. It’s – the issue is the size of it, not issue is we’re working it. I’d say, it’s a 10 million to 20 million barrel discovery, but you’re talking about a50 yard tieback from here to my office to flow this well into one of the most successful platforms in the Gulf with manifolds pipes in place. So the economics of this similar Samurai, which are incredible this will have a incredible economic. And also as we operate other fields and operate King’s Quay, a new set of well from not involved with the original field will lower the operating expenses across the whole platform for us. And well, so this is a very positive for us. Is it a massive oil field? No. But we can make a lot of money and do well here and work with our partners and we were able to be carried in the well a little bit and we’re hoping to be able to do that in other places, because of our – we have – we’re a top executing company, Leo, in the Gulf. Onto Oso, it is – not Oso, I’m sorry, Chinook 7, it is in a field that’s been drilled many wells there. You can see the number seven, if you will. I would say, it’s a little better than one in five exploration well. It is in a totally undrilled fault block. A lot of these major Wilcox fields such as St. Malo and also here at Cascade, Chinook and many others in the Gulf have two big features to them with a large fault down the middle of the field. This so happens to have not been tested. We looked at this and compared it to other wells that have been drilled on both sides of major faults through these facilities, I mean, through these type plays. And we have a big nice well to drill here. It can make this project last out to 2040. The FPSO, there is a very, very highly operated efficient FPSO. We can move the crude off that FPSO where we need to on the Gulf Coast with tankers. So it comes with positive differentials and a many positive things for us. So it’s in a – it’s near the field, but in a totally untested fault block. And that we’re very happy to be drilling that well and have a chance to, again, add more to our backlog. The well could get very large in size requiring multiple wells as successful or could be a simple tieback. So real happy about it and thank you for asking us about it.