Operator

Operator

Ladies and gentlemen, thank you for standing by. Welcome to Teck's Fourth Quarter 2010 Results Conference Call. At this time, all participants are in listen-only mode. Later, we will conduct a question-and-answer session. This conference call is being recorded on Wednesday, February 9, 2011. I would now like to turn the Conference Call over to Greg Waller, Vice President Investor Relations and Strategic Analysis. Please go ahead.

Greg Waller

President

Good morning. Thanks, operator and thanks for joining us, everybody. The forward-looking information slides are on page three and page four. We need to draw your attention to those. This presentation contains forward-looking information regarding our business, various risks and uncertainties may cause actual results to vary. Teck does not assume the obligation to update any forward-looking statement. And at this point, I'd like to turn the call over to Don Lindsay.

Don Lindsay

Management

Thanks very much, Greg. Good morning all and thanks very much for joining us. I will start with a review of the results for the quarter and then turn the presentation over to Ron Millos, our Senior Vice President of Finance and CFO to address a more in-depth financial topics and I should say a number of the other members of the Management team are on the call this and available to answer your questions. Turning to slide five, we are very pleased with the results for the year. We set a new record for company revenues this year at over 9.3 billion. Operating profit after depreciation and amortization was almost 3.6 billion which was up 30% over 2009 compared to the revenues being up 22%. Net earnings were 1.9 billion and EBITDA was almost 4.3 billion. Slide six shows our adjusted earnings for the year and a comparison to last year. Due to the number of unusual items, we had both this year and last year adjusted earnings which removed the effects of the unusual items gives a much better picture of our fundamental earnings power. Adjusted earnings of 1.5 billion or 2.61 per share on a fully diluted basis are 24 percent from higher than the per share figure last year and adjusted EBITDA was 4 billion for the year. Turning to slide seven, there are a number of highlights in the quarter. The quarter was also a record for revenues at over 2.8 billion. Operating profit after depreciation and amortization was 1.2 billion which was up over 16% over the third quarter of this year and up 55% year-over-year. Earnings were 361 million but were impacted by a 289 million after-tax charge related to the repurchase of a portion of our debt so with adjustments, earnings were…

Ron Millos

Management

Thanks Don. And I'm on slide 17, where we've summarized our changes in cash for the quarter. Our cash flow from operations was $900 million in the quarter, which is up almost 34% from the third quarter. Our working capital change was positive this quarter due to changes in the various working capital items. During the fourth quarter, we sold a portion of our coal receivables which reduced our working capital by approximately a 150 million at the end of the year. Capital expenditures and investments were 309 million for the quarter and that included 86 million on sustaining projects and 214 on our major development projects. We reduced our debt by 1.2 billion in the quarter as part of our overall liability management program bringing our total debt reduction for the year to 3.1 billion and that will save us about $225 million per year in interest cost. And after allowing for payments to our partners and the effect of the exchange rate changes on our cash, our net change in cash in the quarter was a decrease of 345 million and we ended the quarter with $832 million in cash. Slide 18 shows our final pricing revenues for the fourth quarter. As we highlight each quarter, pricing adjustments on sales of our various products can have a significant impact on revenues. Outstanding provisionally priced receivables at the end of any quarter are final price based on contractual quotational periods for subsequent periods resulting in positive or negative price adjustments depending on the movements in that commodity prices. Final pricing adjustments for this quarter were positive. On settlements within the quarter, the largest impact was in copper, where we had 81 million pounds of receivable settled in the quarter at $0.25 per pound higher than the price of which…

Don Lindsay

Management

Thank you, Ron. And before we close, I would like to update you on the status of the many development projects that we have underway. At Quebrada Blanca, full feasibility study commenced in early 2011 and is expected to be completed by the end of the first quarter in 2012. Positive feasibility study could potentially result in a decision to undertake project development with production in early 2016. At Relincho, the pre-feas is underway and it is expected to be completed in the first quarter of 2012. Continuing in copper, the Galore Creek pre-feasibility is expected in Q2 2011. And in our energy division, we're working on a pre-feasibility study for the Frontier Oil Sands project with the possibility of Equinox as a satellite mine as well. And this study is expected to be completed in Q4 of 2011, which will also to be marked by the filing of a regulatory application. And in coal, the feasibility study for the restart of the Quintette coal mine is proceeding and it's expected to be complete in mid 2011. Assuming the results of this study are positive and development proceeds, the mine could be in production by 2013 at an annual rate of approximately 3 million tons per year. So, we have lots of exciting growth opportunities coming and I look forward to reporting on the development of these – on the status of these projects in the quarters ahead. In summary, before I turn it over to questions, we have a solid balance sheet. We're now focused on the strong and increasing cash flow from our business. Our coal business is very exciting with robust fundamentals and market prices and increasing production for a moderate amount of capital. Our copper production is expected to grow to over 400,000 tons annualized by 2012. And we are moving forward with several development projects to enhance shareholder value even further. And with that, I would like to turn it over to questions. Do we have any questions?

Operator

Operator

Thank you. We'll now take questions from the telephone lines. (Operator Instructions). The first question is from Harry Mateer of Barclays Capital. Please go ahead. Harry Mateer – Barclays Capital: Hi guys. I was just wondering if you can talk about your priorities in cash flow now and specifically when you look at the high coupon debt remains outstanding, is that still something you're interested in reducing over time or have your priority shifted elsewhere?

Don Lindsay

Management

We had a pretty good program in the second half of 2010 which we're pleased with the results of – it's a kind of thing that we'll monitor throughout the year. At the moment, we have no plans to do anything further. But we'll watch market conditions and make decisions based on what are the uses of capital we have now. Harry Mateer – Barclays Capital: Okay. Thanks very much.

Operator

Operator

Thank you. The next question is from Sal Tharani of Goldman Sachs. Please go ahead. Sal Tharani – Goldman Sachs: Thank you. Can you just give us some color on the Andacollo concentrator cost how to model that? I think it was 60 million in the fourth quarter.

Roger Higgins

Analyst · Goldman Sachs

This is Roger Higgins. Thanks for the question. Andacollo was in ramp up mode throughout 2010. We achieved 90% of growth because in our press release in September, we declared initial production at that time and since that time, Andacollo's partners contributed positively to become most yielded. We are still working our way through as the whole new plant, the process of optimizing and the greatest focus we've had at that time just to get the production first, make sure we are able to get throughput through the plant and in recoveries metallurgical prices is correct and then sort of focus on optimizing the cost after that. Just getting the first price of that doing some work to ensure that we can get the tonnage up but largely to design storage. As we achieve that, we'll hope some benefits in costs in two different directions basically the more consistent production and more pounds. We'll reduce the unit cost simply by adding more pounds just get the cost over and then we will be able to focus principally on maintenance costs earnings and bring the cost into long moving asset. Taking on to put real numbers on, it's the process we need to get through in the – particularly in the first half of the coming year. But we see it as a mid range in terms of the fuel on cost of the (inaudible) producer going forward. Sal Tharani – Goldman Sachs: Thank you. I also wanted to ask about the impending second labor contract coming up on in April for Fording. Has there been any discussion with the labor union on that?

Bob Bell

Analyst · Goldman Sachs

It's – Sal, Bob Bell here. It's a bit early for us to get in those discussions right now we're focused on the situation of the Elkview. Sal Tharani – Goldman Sachs: Okay. Thank you very much. I'll get back in the queue.

Operator

Operator

Thank you. The next question is from Duncan McKeen of Macquarie. Please go ahead. Duncan McKeen – Macquarie: Yeah. Thanks very much guys. I just want to ask regarding new realized prices for Q1 of this year. Can you just explain how your realized prices are coming in so far below the benchmark, which is it 225 for the contract price? Thanks.

Don Lindsay

Management

Duncan, let say, what goes into the average pricing is a whole mix of pricing. If you actually look back at guidance from last year, in Q3, we had benchmark price at 225 same as what we had in the first quarter and yet guidance was 195 to 200. So, what we're – the guidance we're giving for this quarter 2006 to 2011 is actually quite a bit tighter than what it was in Q3. But it's a mix of all the products we're selling and mix of the spot pricing and contract pricing. Duncan McKeen – Macquarie: Is there – what percentage of your coal overall is the premium coal?

Don Lindsay

Management

Generally, it's about 85% to 90%, would be what you call hard coking coal. But even within that hard coke coal range, there is a spectrum of qualities that gives you a pricing band. Duncan McKeen – Macquarie: Okay. So, it's probably the reason for you realize – is your lower realized pricing is there some lower prices coming through from the Vancouver from Greenhills?

Don Lindsay

Management

That wouldn't have had a huge impact and as I say the gap between the benchmark and our realized price in Q1 is actually tighter than what it had been when we have the same pricing in Q3 of 2010. So, it's – I wouldn't say that there is an anomaly there. It's important to remember that in Q4 of 2010, we had less sales from the Coal Mountain operation because of the late disruption there. So, you would have seen a tighter band in Q4 than you would normally have. Duncan McKeen – Macquarie: Okay. Thank you.

Operator

Operator

Thank you. The next question is from Terry Ortslan of TSO & Associates. Please go ahead. Terry Ortslan – TSO & Associates: Good morning. I have a lot of things on the plate for feasibility studies for 2011 going into 2012. I guess Ron and Don combined just I'm asking for just – are you going to be – how much – each one of you are going to be able to do internally, each one is going to top the outside market and how much do you want to leave at the balance sheet in the process going into next few years on this capital expenditures?

Don Lindsay

Management

I think, it's important to look at the timetable. A lot of these are pre-feasibility studies, so you don't have to go to full feasibility before you get to construction decision and then you having made the construction decision large CapEx doesn't occur for sometime after that. So, they are kind of spread out and in the mean time we have quite high prices and very strong cash flow. So, a lot of cash should build up between now and when CapEx would start to occur. So, at the moment when we do our models, we could do it all internally. We don't know what the prices will hold at these levels of course, but I think we just have to take it quarter-by-quarter and see. In some cases where we have partners, it may make sense to engage in project financing, because they have an interest in that. So, we will look at those opportunities as time progresses. But right now, we don't think it will have that much effect on the balance sheet. Terry Ortslan – TSO & Associates: Thanks. The other question is on the labor contracts. Can you remind me what else is coming up this year?

Don Lindsay

Management

We have – as we just mentioned Fording River in April and then Highland Valley, Roger what month is Highland Valley?

Roger Higgins

Analyst · TSO & Associates

I believe the September, Don.

Don Lindsay

Management

All right. Terry Ortslan – TSO & Associates: Okay. And Don just to be on this one here, can you talk about the not the month of demand side, but more like on the balances on the supply side in China also on the cost rates level. What shifts do you see this year 2011 on the lead and zinc imports and also the production profiles in China?

Don Lindsay

Management

And well, of course it's always hard to know, but we have seen the growth rate of mined zinc production in China come down quite a bit. They were still growing at a small-to-moderate rate. Their consumption of course has been very strong and so the country has still been in an import situation, but it's very hard to make forecast on these things. Terry Ortslan – TSO & Associates: Enough. Thank you.

Operator

Operator

Thank you. The next question is from David Radclyffe of BMO. Please go ahead. David Radclyffe – BMO: Hi, everyone. So, having looking at the presentation here, it looks like that the QB and Relincho studies have actually been pushed back a couple of quarters from the targets we discussed at the Investor Day and just in regards to this, I was just wondering could this potentially impact from a startup of those projects. I'm just trying to work out what maybe the scope of the delay, is it Relincho? I know you were looking a potential upgrade in the resources, so the scope of that projects maybe changed at all. And then because now Galore Creek pre-feasibility study will be ahead of Relincho, does that mean Galore Creek naturally moves up in your mind in terms of when it could be delivered?

Don Lindsay

Management

I'll answer the last question first and then to Roger or Tim on the first two. The answer is no. Galore Creek will not be put ahead of Relincho. And it is one of these things were related to the results of the studies before making any final decisions, but from Teck's point of view, Relincho is the high priority project.

Tim Watson

Analyst · BMO

With respect to QB on the timing of that particular project, the completion of the feasibility study is we're showing now and basically the same timeline is that we expect to be submitting the EIA to the government for final permit approval. And then the goal from that point is then to carry on with the basic engineering as we're progressing through the EIA process. With respect to Relincho, the overall scope of the project has not changed. We are as we're going through the feasibility study finalizing some of the options with respect to throughput and some of our processing options. So in terms of the scope of that particular project, it's roughly the same as QB quite a large concentrator. We are focusing on the seawater processing evaluating our port options as well as the power options for the project. David Radclyffe – BMO: Okay. So, even if the studies are taking six to nine months longer, you still think you could meet that sort of 2017 target?

Tim Watson

Analyst · BMO

That's correct. Yes. David Radclyffe – BMO: Okay. Thank you.

Operator

Operator

Thank you. The next question is from Greg Barnes of TD Securities. Please go ahead. Greg Barnes – TD Securities: The question focused on the copper operations. Cash cost at QB were pretty high in the first – fourth quarter and just wondering how you expect that to trend going forward?

Roger Higgins

Analyst · TD Securities

Yeah. Thanks Greg. There are two main drivers of that cost, one of them is somewhat larger tons as stripping ratio has gone up a little bit. We moved more tons at QB in 2010 than we've got to move before. So that is – that's permanent and we will be facing that in the future. But the other one more important perhaps is that what will be the costs – the cost increase that you're noticing really could be accounted and pulled by increased energy cost whether it's off leasing the good in Northern Chile or for fuel oil for our entire station and that's not a controllable particularly. So that we'll depend on how those costs progress, that's not so. And we're now working hard at it and we do have some more bigger equipment came in during the course of the year, which will help us with our unit costs, but those are the two principal drivers of QB. Greg Barnes – TD Securities: Do you think costs there on the per pound basis being in the $1.40, $1.50 range going forward?

Roger Higgins

Analyst · TD Securities

I hope not that we can bring them down under that Greg. Greg Barnes – TD Securities: What do you think is the appropriate number?

Roger Higgins

Analyst · TD Securities

Somewhere below that. Greg Barnes – TD Securities: Okay. Just another question on another topic, the coal production ramp-up in the Elk Valley, just wondering how you see that progress, I know you said second half waited this year but how you see that progress over 2012 and 2013?

Bob Bell

Analyst · TD Securities

Don, did you want to – did you want me to answer or would you like to...

Don Lindsay

Management

Yeah. The only comment I would make is we do have to get the plant upgrades finished and that obviously makes the big difference to what capacity we can put through but Bob you go ahead for that.

Bob Bell

Analyst · TD Securities

Yeah. The rest of the develop that ramp-up, we've given a sort of a trajectory in the past heading towards the 30 million ton range and then adding the Quintette above that. So, we're still focused on delivering that and it's about plant upgrades and it's equipment and we're on that path. Greg Barnes – TD Securities: Bob, do you mean 30 million tons out of Elk Valley or 30 million...

Bob Bell

Analyst · TD Securities

No, no that's – it's a – no, we've given that as a total – that's the target for the total existing mining operations and we're still aiming towards that. Greg Barnes – TD Securities: The 30 million tons doesn't include Quintette?

Bob Bell

Analyst · TD Securities

That's right. And I'm sorry, it was – we gave 29 million tons without Quintette. Greg Barnes – TD Securities: Okay. So, by the end of 2013 do you think you'll be at – at exit rate you'll be at around 28 million, 29 million tons by then?

Roger Higgins

Analyst · TD Securities

It's a bit early to get precise. We go year-by-year when we put our plans together and we've given where we're going to go in 2011. And we'll go through the same process as we get to every year. So, it's a – I wouldn't want to speculate on exactly when we hit the certain target. Greg Barnes – TD Securities: Okay. Thank you.

Operator

Operator

Thank you. The next question is from Alec Kodatsky of CIBC. Please go ahead. Alec Kodatsky – CIBC: Thanks and good morning. Actually, I have two questions here, first just in terms of the CapEx, I mean particular sustaining CapEx. It looks like there is a pretty meaningful increase at the coal operations year-over-year. I'm just curious whether there has been any sort of scope changes as far as the expansion plans are potential for cost over runs and – pardon me. And secondly, you also mentioned in the release on-site mine inventories for coal are high, port inventories are low and just wondering if you could potentially give us some clarity as what those numbers are? Thanks.

Don Lindsay

Management

On the first question, it's not as big as increases that might look because the significant amount of the sustaining CapEx from last year wasn't spent and it's rolled forward into this year. Ron Millos, I'm not sure if you have the number available if you could get someone to look it up and get back to the question early, turn this over to you.

Ron Millos

Management

Yeah. It's – for next year it's about 275 million. I don't have the split handy on how much was carried forward, but we'll get that and have Greg distribute it. Alec Kodatsky – CIBC: Okay. Thanks. And it's a...

Greg Waller

President

And the question was on the mine-site coal inventories? Alec Kodatsky – CIBC: Yeah. Thanks Greg.

Bob Bell

Analyst · CIBC

We don't disclose our exact mine site inventories. They are quite high from a historic basis. And that's one of the reasons why we haven't altered our guidance for the sales in this current quarter. But we're obviously working very closely with our rail service provider to find ways to move as much of that to the coast as possible and as quickly as possible to take advantage of current market. Alec Kodatsky – CIBC: Okay. Well, thanks very much.

Operator

Operator

Thank you. The next question is from John Hughes of Desjardins Securities. Please go ahead. John Hughes – Desjardins Securities: Thank you operator and just a couple of quick ones. On Elkview, are they in negotiations with the union ongoing today? Hello?

Don Lindsay

Management

Yeah. The status of the Elkview discussion is we have various range of contacts with them on different schedules. And we really don't want to comment or negotiate in the public domain about our discussions there. We remain optimistic that we will be able to settle and we feel we've made a very strong offer to the union. John Hughes – Desjardins Securities: Yes. Sort of, highlight for that operation what your budgeted production number was for 2011?

Ron Millos

Management

John, it's about 20% of our overall coal production. John Hughes – Desjardins Securities: Okay. And we can apply that 20, Greg, to the range of 24.5 to 25.5?

Greg Waller

President

Yes. John Hughes – Desjardins Securities: Okay. On Red Dog, just a quick one the – I know you are operating today with the renewed water discharge permit, and I'm just wondering how concerned we should be with the possibility that existing permit can be (inaudible)?

Doug Horswill

Analyst · Desjardins Securities

John I think – yeah, it's Doug Horswill here. There is no chance of that. We're operating to the 1998 permit but also to a court ordered level that we have used since 1998. We are working with the EPA in the state and those processes we're going through. We can't predict. We've tried in the past, but it's just hopeless to try and predict exactly when all of that will get sorted out. But in the mean time, we feel very secure and confident in our continued operation and there are no problems. John Hughes – Desjardins Securities: I guess, in the absence of any sort of renewed, sort of problem like an appeal any further appeal then everything is from an operating perspective. What you're doing today you'll continue through the course of the year?

Doug Horswill

Analyst · Desjardins Securities

Yes. And whether or not there is appeal, I mean they just – that's a matter of course of business in the U.S. These things are appealed. We just anticipated and just where we have the support of EPA in the state in respect to our current operations and we will continue to do that. John Hughes – Desjardins Securities: Great. Thank you, Doug.

Doug Horswill

Analyst · Desjardins Securities

Continue to operate. John Hughes – Desjardins Securities: Yeah. That's great. Thank you very much indeed.

Doug Horswill

Analyst · Desjardins Securities

Okay.

Operator

Operator

Thank you. The next question is from Oscar Cabrera of Bank of America. Please go ahead. Oscar Cabrera – Bank of America: Hi, good morning gentlemen. Let's start with your reported first quarter 2011 coal price; the press release is $206 to $211 a ton, but the presentation has a lower range 200 to 205, so...

Don Lindsay

Management

Yeah, Oscar it's a mistake in our slides. The numbers that we have given in the release are the correct guidance. Oscar Cabrera – Bank of America: Okay. And if so, then can you give us the – Bob Bell talked about the mix in the production, but can you give us the amount of thermal coal that would be included in that number?

Bob Bell

Analyst · Bank of America

Oscar, we don't generally give such specific guidance, but generally our thermal coal or you’d say thermal coal and lower grade steel-making coals would be sort of in the 10% range, but it depends on what's happening in that particular quarter. Oscar Cabrera – Bank of America: Okay. Thanks a lot, Bob. And then second question with regards to Elkview, I know that it's a sensitive issue and you want to comment in the public domain, but in – could you give us color on how your expansion plans would change, i.e., are you at a stage right now where the stripping in the mines is complete. Therefore our factory strike can impact that profile as much, can you comment on that?

Don Lindsay

Management

No, we could not comment on that kind of detail; it wouldn't be appropriate. Oscar Cabrera – Bank of America: Okay. And then lastly on your copper development projects, as you're progressing about the feasibilities and pre-feasibilities, any chance you can give us an idea of the CapEx on a per ton basis, be it on a concentrate – cost per ton of concentrator per ton of contained copper? Thanks.

Don Lindsay

Management

I think it's very good question, but we'll have to wait till the feasibility is finalized before we release numbers like that, because it would just be an estimate at this stage. So, I think it's important to get the final report. Oscar Cabrera – Bank of America: Okay. Thank you.

Operator

Operator

Thank you. The next question is from Sal Tharani of Goldman Sachs. Please go ahead. Sal Tharani – Goldman Sachs: Thank you. Don, have you looked into further expansion in the coal sites outside the organic growth particularly on the thermal coal sites through acquisitions. Is that something I mean you are already in the Oil Sands energy, would that be of an interest to the company?

Don Lindsay

Management

Sorry, then the question is on thermal coal? Sal Tharani – Goldman Sachs: Yeah, thermal coal.

Don Lindsay

Management

Well, we watch the industry and look at the opportunities that are out there from time to time, but we haven't seen anything that would make sense for us at this stage. We like the steel-making coal business a lot and we have made a big investment that we want to optimize that investment and maximize the value of it. So, our attention is really focused on that. Sal Tharani – Goldman Sachs: Okay. And the next question is on the copper market, any comments you're seeing any – there is a reload there that there is too much copper being offered by different participants and have you seen any resistance in purchases of copper at this price level?

Andrew Stonkus

Analyst · Goldman Sachs

Sal it's Andrew Stonkus. If I can comment on the copper markets, I think you have to again differentiate while you're talking copper concentrates or copper metal and the concentrates are markets still a structural deficit situation and we don't see that changing in the near-term. On the copper metals side, I think the statistics, I'll point out to deficit on metal as well. What we are seeing is more of a scrap in the marketplace and that's having a potential impact on near-term demand for (inaudible) but ultimately it's a deficit market for concentrates and metal for this coming year. Sal Tharani – Goldman Sachs: Thank you very much.

Operator

Operator

Thank you. The next question is from Peter Epstein of PWP Xerion. Please go ahead. Peter Epstein – PWP Xerion: Hi. Thanks for taking my call. I was talking to step back and look at a big picture fundamental view of what's going on in the highest quality coking coal segment, given what's happening in Australia for example and even in other parts of the world the supply stock, can you talk about that a little bit?

Don Lindsay

Management

In the sea borne metallurgical coal market, the number of sources of supply is fairly limited. So you can track what is likely to come on in the next two or three years fairly easily. Obviously, Australia is the largest source by far and the flood had a series impact. So, it takes out large amount of tonnage. No one knows exactly how much and they have made investments after 2008 to improve on the capability and their estimate and the ports have improved. So, it's hard to estimate just what the shortfall will be. But there certainly is a shortfall and the market is very tight. So we'll be trying to produce as much as we can. But as you'll see in all aspects of the mining industry, there are day-to-day operational challenges and we've had our own issues there ranging from avalanches to port issues. And I think you'll find throughout the industry whichever country that they will continue to be always kind of challenges. So, as I said in other forms, it's tough enough to just to keep the current operation running at full capacity with all the challenges we have let alone increase production on the Brownfield’s basis but alone and started new Greenfield’s operation. So, I think given all those challenges that supply will stay tight in this sea borne metallurgical coal market for some time. Peter Epstein – PWP Xerion: And then a quick question on trying to – I'm not sure of how closely you follow China specifically as opposed to the overall Asia market, but it seems like they haven't really been active in the coal market on the coking coal side. Do you have a sense of if they're going to become more active and how soon?

Don Lindsay

Management

Well, we actually would think that they have been active and that's judging by their import numbers, that the imports have gone up from a level in 2008 of just over 3 million tons to actually 45 million tons in 2010. And then there is 34 million tons in 2009. And there is – it doesn't seem to be any indication of that will change. The largest source of coking coal particularly hard coking coal in China is Jiangxi Province. And in 2009, they shut down 1000 mines there for safety reasons. And there is a consolidation phase for the industry. They are increasing production again but they haven't got back yet to the level they were at in 2008. In the mean time, the steel industry has grown by about almost a 100 million tons of the steel production and the associated coking coal that goes with that. So, we think, in fact, China as we would think of it is the most active participant and really what goes on in that market is really setting the price. And so we've paid very close attention with people in China whose full time job is to study what's going on there and while they live in Beijing, they travel there frequently and give us reports very frequently. And so we watch the cost of production that they have there and compare that to what it cost to buy Seymour and coal FOB Vancouver or FOB Australia. And the costs have been going up quite considerably in China, because the minds are getting deeper. The themes are narrower. Labor costs are getting higher and of course, most importantly, as the currency – the Chinese currency appreciates that of course means that their cost in U.S. dollars is going up relative to our cost in U.S. dollars FOB Vancouver. So, we think those three factors deeper mines, higher labor costs, sometimes labor cost going up at 16% or 17% per year, as you've seen also in some other industries, autos in particular and then increase in currency will continue to drive the cost of production in China up relative to FOB Vancouver. So that maybe a bit more detail than you're asking about, but that's the really important dynamic that I think people need to understand in the sea borne steel-making coal market. Peter Epstein – PWP Xerion: No. That's the kind of detail, I was looking for actually. I appreciate that very much. With regard to China, I meant so far in 2011 it seemed that have been active in the coking coal front. Is that still something that you would disagree with?

Don Lindsay

Management

Yes. I mean it's only five or six weeks in that, it would be hard to tell. Peter Epstein – PWP Xerion: Okay. Thanks.

Operator

Operator

Thank you. The next question is from Duncan McKeen of Macquarie. Please go ahead. Duncan McKeen – Macquarie: Yeah, my question has been answered. I'll let someone else jump in. Thank you.

Operator

Operator

Thank you. The next question is from Tony Rizzuto of Dahlman Rose. Please go ahead. Tony Rizzuto – Dahlman Rose: Thanks very much. Hi gentlemen. I've got a question, couple of questions actually a follow on to a previous question, just wanted to know from a standpoint of copper what you might be building in from a standpoint of possible substitution loss in demand into your analysis. And then I wanted to ask a question just to gauge your thoughts on, if you're changing your views at all with regard to hedging and specifically with regard to copper?

Don Lindsay

Management

Quickly on the second question, no change of views on hedging with respect to copper and Andrew over to you on the first question.

Andrew Stonkus

Analyst · copper what you might be building in from a standpoint of possible substitution loss in demand into your analysis. And then I wanted to ask a question just to gauge your thoughts on, if you're changing your views at all with regard to hedging and specifically with regard to copper

On the substitution side, Tony, it is a concern, I think we do put into our model but I don't have the exact percentage that we would factor into that. There are certain aspects of the substitution side, obviously on the plumbing side of the end users that's been ongoing for the last few years. But the basic requirements or the capability of copper conducting as a conductor, that doesn't change. So, we feel that there is some substitution threats, but overall it's – we feel some very strong growth market as such China and the developing world continues to electrify their infrastructure. So, the main use for copper is going to continue to grow. Tony Rizzuto – Dahlman Rose: Thanks very much, guys. And just a quick follow-up, if I may, Don that was some great insight about the metallurgical coal industry in China. What is the current self-sufficiency ratio of China in metallurgical coal?

Don Lindsay

Management

I'm not sure what you mean by self-sufficiency. But I think in total and Bob Bell or Greg may have these numbers, but in total China consumes I guess something like 450 million to maybe as much as 500 million counting all industries, tons of coking coal of all blends and qualities. And so if they are importing 45 million tons, I don't know if you could get that, but I think what's more important and actually this is a very important point. Coal is not coal is not coal and it's something we see as people compare coking coal to iron ore for example or other things that coking coal – steel-making coal is sold shipload by shipload to certain steel plants that have certain specifications and as part of the blend they've tested over the months and years before they fitted into their blend and the difference in value and use between high quality hard-coking coal and then semi-soft or PCIs or whole another product, these are all very different things. So, to calculate self sufficiency kind of ratio, you really should be looking at comparing apples-to-apples and say, okay they are – how they imported x number of tons of hard-coking coal versus they consume annually x number of tons. And those numbers are very difficult to get just the way China discloses their production. Tony Rizzuto – Dahlman Rose: That's great stuff. Thanks a lot Don. I appreciate it.

Operator

Operator

Thank you. There are no further questions registered for the moment. Please go ahead.

Greg Waller

President

So, there is no further questions. Thanks everybody for joining us this morning and we look forward to talking to you next quarter. Thank you.

Operator

Operator

Thank you. The conference has now ended. Please disconnect your lines at this time. We thank you for your participation.